Laserfiche WebLink
CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br /> ITEM ITEM DESCRIPTION <br /> NO. NIT = OTY. : . UNIT om QTY.- . UNIT QTY. UNIT <br /> PRICE -: :' PRICE PRICE. <br /> ,SCHEDULE 4.0 CROFT DRIVE RECONSTR. • <br /> 1 REMOVE CONC. CURB & GUTTER LF 2077 $3.25 0 $0.00 2077 $6,750.25 <br /> 2 ADJUST EX. MANHOLE CASTING EA 4 $130.00 0 $0.00 4 $520.00 <br /> 3 WATER FOR DUST CONTROL MGAL 15 $10.00 0 $0.00 15 $150.00 <br /> 4 COMMON EXCAVATION CY 3848 $5.30 0 $0.00 3848 $19,334.40 <br /> 5 SUBGRADE PREPARATION RDSTA 10 $100.00 0 $0.00 10 $1,002.00 <br /> 8 GEOTEXTILE FABRIC SY 3430 $1.00 0 $0.00 3430 $3,430.00 <br /> 7 SELECT GRANULAR BORROW(CV) CY 2290 $7.30 0 $0.00 2290 $18,717.00 <br /> 8 4' PERF. (PE) CORR. PIPE DRAIN LF 2077 $3.00 0 $0.00 2077 $8,231.00 <br /> 9 CLASS 5 AGGREGATE BASE TON 1150 $7.30 0 $0.00 1150 $8,395.00 <br /> 10 2331.TYPE 31B BASE MIXTTRE TON 378 $24.00 0 $0.00 378 $9,024.00 <br /> 11 2331.TYPE 41A WEAR MIXTURE TON 282 $27.00 0 $0.00 258.05 $8,913.35 <br /> 12 BITUMINOUS TACK COAT GAL 150 $1.00 0 $0.00 150 $150.00 <br /> 13 B818 CONCRET CURB & GUTTER LF 2077 $5.20 0 $0.00 2077 $10,800.40 <br /> 14 2' BIT. DRIVEWAY RESTORATION SY 77 $10.00 0 $0.00 77 $770.00 <br /> 15 8'CONC. DRIVEWAY RSTORATION SY 200 $22.00 0 $0.00 200 $4,400.00 <br /> 18 SAW CUT CONCRETE LF 420 $3.50 0 $0.00 420 $1,470.00 <br /> 17 CONCRETE DRIEWAY APRON SY 180 $22.00 0 $0.00 180 $3,980.00 <br /> 18 4"CONCRETE WALK SF 48 $2.30 0 $0.00 107 $248.10 <br /> 19 SELECT TOPSOIL BORROW CY 75 $10.00 0 $0.00 75 $750.00 <br /> 20 SOD, LAWN& BOULEVARD TYPE SY 3200 $1.40 0 $0.00 3200 $4,480.00 <br /> 21 SUBGRADE TESTING LS 1 $200.00 0 $0.00 1 $200.00 <br /> 22 GRANULAR BORROW TESTIN LS 1 $800.00 0 $0.00 1 $800.00 <br /> 23 CLASS 5 AGGREGATE TESTING LS 1 $300.00 0 $0.00 1 $300.00 <br /> 24 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0.5 $450.00 <br /> T SCHEDULE 4.0 CROFT DRIVE RECONSTR.-Total $0.00 $107,243.50 <br /> SCHEDULE 5.0 COOLIDGE& 27TH AVE ST.IMPROVE. <br /> 1 REMOVE CONC. CURB&GUTTER LF 1300 $3.25 0 $0.00 1300 $4,225.00 <br /> 2 REMOVE BITUMINOUS PAVEMENT SY 2050 $1.70 0 $0.00 2050 $3,4 <br /> 3 EROSION CONTROL LF 800 $2.00 0 $0.00 0 <br /> 4 COMMON EXCAVATION CY 2861 $5.30 0 $0.00 2881 1 . 0 . <br /> 5 CLEAR 7 GRUBB TREE(OVER 8" DIA.) EA 5 $150.00 0 $0.00 5 $750.00 <br /> 6 SUBGRADE PREPARATION RDSTA 7 $200.00 0 $0.00 8.5 $1,300.00 <br /> 7 GEOTEXTILE FABRIC SY 2311 $1.00 0 $0.00 2311 $2,311.00 <br /> 8 WATER FOR DUST CONTROL MGAL 10 $10.00 0 $0.00 10 $100.00 <br /> 9 SELECT GRANULAR BORROW(CV) CY 1540 $7.30 0 $0.00 1540 411,242.00 <br /> 10 4"PERF. (PE)CORR. PIPE DRAIN LF 1320 $3.00 0 $0.00 1320 43,980.00 <br /> 11 CLASS 5 AGGREGATE BASE TON 780 $7.30 0 $0.00 780 $5,894.00 <br /> 12 2331.TYPE 31B BASE MIXTURE TON 255 $24.00 0 $0.00 255 $8,120.00 <br /> 13 2331, TYPE 41A WEAR MIXTURE TON 191 $27.00 0 $0.00 175.25 $4,731.75 <br /> 14 BITUMINOUS TACK COAT GAL 101 $1.00 0 $0.00 101 $101.00 <br /> 15 8818 CONCRETE CURB&GUTTER LF 1320 $5.20 0 $0.00 1320 $6,884.00 <br /> 18 2"BIT. DRIVEWAY RESTORATOIN SY 24 $10.00 0 $0.00 24 $240.00 <br /> 17 8"CONC. DRIVEWAY RESTORATION SY 28 $22.00 0 $0.00 45 $990.00 <br /> 18 CONCRETE DRIVEWAY APRON SY 20 $22.00 0 $0.00 20 $440.00 <br /> 19 SELECT TOPSOIL BORROW CY 150 $10.00 0 $0.00 375 $3,750.00 <br /> 20 SEEDING ACRE 1 41,200.00 0 $0.00 0.5 $800.00 <br /> 21 SOD, LAWN&BOULEVARD TYPE SY 3200 $1.50 0 $0.00 3200 $4,800.00 <br /> 22 SUBGRADE TESTING LS 1 $200.00 0 $0.00 0.5 $100.00 <br /> 23 GRANULAR BORROW TESTING LS 1 $500.00 0 $0.00 0.5 $250.00 <br /> 24 CLASS 5 AGGREGATE TESTING LS 1 $200.00 0 $0.00 0.5 $100.00 <br /> 25 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0.5 $450.00 <br /> T SCHEDULE 5.0 COOLIDGE&27TH AVE ST.IMPROVE. $0.00 $78,707.05 <br /> SCHEDULE 8.1 STORM SEWER ALT, BID <br /> 1 REMOVE EXISTING RCP STORM SEWER LF 236 $4.00 0 $0.00 236 $944.00 <br /> 2 REMOVE EXIST. CB/MH STRUCTURE EA 10 $120.00 0 $0.00 10 41,200.00 <br /> 3 15" HDPE LF 342 $19.00 0 $0.00 342 $8,498.00 <br /> 4 STD.STORM MANHOLE(48" DIA.) EA 5 $1,200.00 0 $0.00 5 $0.0 <br /> 5 STD.STORM MANHOLE(48" DIA.) EA 4 $1,200.00 0 $0.00 4 44,8 <br /> 8 GRANULAR FOUNDATION MAT'L. TON 35 $10.00 0 $0.00 35 $35 <br /> T SCHEDULE 8.1 STORM SEWER IMPROVEMENTS-Total $0.00 $19,792.00 <br /> 490015_Nol <br />