My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04251995
StAnthony
>
City Council
>
City Council Packets
>
1995
>
CC PACKET 04251995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:24:19 PM
Creation date
12/30/2015 6:24:11 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 04251995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEMPER AND ASSOCIATES 612 631 $8 05 P. 02 <br /> Ke►nper & Associates, Inc. <br /> • Innsbruck Office Park(Silver Lake Rd. & 694) <br /> 2722 Highway 694 <br /> New Brighton, MN 65112 <br /> Tole hone (612) 631-0351 <br /> Fax 612) 631-8805 <br /> April 18, 1995 <br /> Ms. Kim Moore-Sykes <br /> City of St. Anthony Village <br /> 3301 Silver Lake road <br /> St. Anthony, Minnesota 554181699 <br /> Phone: 789-8881 <br /> 781-9323 <br /> RE: Plat of Verkins First Addition <br /> Dear Kimt <br /> As per our phone conversation this morning, Y wanted to address the <br /> f ax to Planning <br /> concerns that William R. Soth had talked to Bill thishmorning and <br /> Commission dated April 14, 1995. <br /> believe I have answered his � ifor this evening"s ons d meeting each <br /> individually to avoid any confusion <br /> item #1. Lot Size. All lots meet required minimum sizes. <br /> cc <br /> All lots have street item #2 . e s t access. Lots it 2, and 3 s. a permit for <br /> to 29th Avenue N.E. and fe Pending), Highway 88 ( P <br /> Lot 5 for Highway 88 <br /> Item 13 . Frontage. All lots have the required frontage. <br /> Item #4• Sets S• <br /> All lots show a proposed building envelope <br />. which meets the required setblines drawn to meet houses <br /> rear setbacksn <br /> an the drawing which have lot <br /> For further detail I have put additional labels on the rear <br /> setbacks of Lots 4 & 5. <br /> Item #5. Sewer. As per conversations with the ci and and was per our <br /> survey, each lot will be able to access City <br /> runs in the front of each lot. <br /> Item #6. Ease ents. The preliminary plat, although cluttered with <br /> many <br /> required items, shows the required 5' and 10' utility <br /> easements on each lot of the preliminary pla • <br /> Item #7 . Title. On Tuesday, April 18th, I called sill Soth and <br /> explained the existing desca Mildred Verkins resides to Mr.evidence <br /> ownership on the parcel where Mild <br /> office and also explained that a small. 100' x 50' triangle taken <br /> Professional Land Surveyors & Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.