My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05111999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 05111999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:07:58 PM
Creation date
12/30/2015 4:07:45 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 05111999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Section 1165.08. Reporting,Obligations. <br /> Subd. 1. Operations,Each Registrant shall at the time or registration and by December 1 of <br /> each year, file a construction and major maintenance plan with the City. Registrants must <br /> use commercially reasonable efforts to anticipate and plan for all upcoming projects and <br /> include all such projects in a construction or major maintenance plan. Such plan shall be <br /> submitted using a format designated by the City and shall contain the information determined <br /> by the City to be necessary to facilitate the coordination and reduction in the frequency of _ <br /> excavations and obstructions of rights-of-way. <br /> The plan shall include, but not be limited to, the following information: <br /> (1) the specific locations and the estimated beginning and ending dates of all <br /> Projects to be commenced during the next calendar year (in this Section, a "next- <br /> year project"); and <br /> (2) the tentative locations and beginning and ending dates for all projects <br /> contemplated for the five years following the next calendar year (in this Section, <br /> a "five-year project"). <br /> The term "project" in this Section shall include both next-year projects and five-year <br /> projects. <br /> By January 1 of each year the City will have available for inspection in its offices a <br /> composite list of all projects of which it has been informed in the annual plans. All <br /> registrants are responsible for keeping themselves apprised of the current status of this list. <br /> Thereafter, by February 1, each registrant may change any project in its list of next-year <br /> projects, and must notify the City and all other registrants of all such changes in said list. <br /> Notwithstanding the foregoing, a registrant may at any time join in a nekt-year project of <br /> another registrant that was listed by the other registrant. <br /> Subd. 2. Additional Next-year Projects. Notwithstanding the foregoing,the City may, for <br /> good cause shown,allow a registrant to submit additional next-year projects. Good cause <br /> included, but is not limited to, the criteria set forth in Section 1165.17, Subd.3 concerning <br /> the discretionary issuance of permits. <br /> Section 1165.09. Permit Requirement. Except as other wise provided in this Code, no person may <br /> obstruct or excavate any right-of-way without first having obtained the appropriate right-of-way <br /> permit from the City to do so. <br /> Subd. 1. Excavation Permit. An excavation permit is required to allow the holder to <br /> excavate that part of the right-of-way described in such permit and/or to hinder free and open <br /> • -9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.