Laserfiche WebLink
passage over the specified portion of the right-of-way by placing equipment described <br /> therein, to the extent and for the duration specified therein. • <br /> Subd..2. Obstruction Permit. An obstruction permit is required to allow the holder to hinder <br /> free and open passage over the specified portion of right-of-way by placing equipment, <br /> vehicles,,or other obstructions described therein on the right-of-way. for the duration <br /> specified therein. <br /> Subd. 3. Permit Extensions. No person may excavate or obstruct the right-of-way beyond <br /> the date or dates specified in the permit unless such person (i) makes a supplementary <br /> application for another right-of-way permit before the expiration of the initial permit,and(ii) <br /> a new permit extension is granted. <br /> Subd. 4. Disruptive Fee. Notwithstanding Subd. 3 of this Section, even if a new permit or <br /> permit extension is granted, the City shall establish and impose a disruptive fee as a civil <br /> penalty for unreasonable delays in right-of-way excavation,obstruction,repair or restoration. <br /> Subd.5. Permit Display. Permits issued under this Chapter shall be conspicuously displayed <br /> at all times at the indicated work site and shall be available for inspection by the City <br /> Inspector and authorized City personnel. <br /> Section 1165.10. Permit Applications. Application for a permit is made to the City. Right-of-way <br /> permit applications shall contain, and will be considered complete only upon compliance with, the <br /> requirements of the following provisions: <br /> (a) Registration with the City pursuant to this chapter. <br /> (b) Submission of completed permit application form,including all required attachments, <br /> and scaled drawings showing the location and area of the proposed project and the <br /> location of all existing and proposed equipment. <br /> (c) Payment of all money due to the City for: <br /> (1) permit fees and costs due; <br /> (2) prior obstructions or excavations; <br /> (3) any loss;damage, or expense suffered by the City as a result of Applicant's <br /> prior excavations or obstructions of the rights-of-way or any emergency action <br /> taken by the City; and <br /> (4) franchise fees, if applicable. <br /> -10- <br />