Laserfiche WebLink
1 <br /> 7. Feasibility and Recommendation <br /> 1 Project costs are anticipated to be approximately$2,633,000,which includes the total <br /> street and utility reconstruction of 29th Avenue from Stinson Boulevard to CSAH 88. <br /> 1 Due to the inadequate capacity of the sanitary sewer mains and the storm mains, this <br /> project is both feasible and necessary from an engineering standpoint. The <br /> ' installation of the sanitary and storm sewer will require the total removal of the existing <br /> street and the partial removal and exposure of the existing water distribution lines. <br /> Under these conditions it is both feasible and necessary to replace the existing street <br /> and water main. Furthermore, due to the location and condition of the existing <br /> utilities, the available street right-of-way, the existing soils conditions, and the need <br /> to provide utility service to all of the properties in the project area, other methods of <br /> 1 improving the utility systems and the roadway are not feasible or cost effective. <br /> Based on our analysis and data presented, the proposed project is feasible, <br /> 1 necessary and cost effective from an engineering standpoint. We recommend the <br /> reconstruction of the sanitary sewer, water main, storm sewer and streets as detailed <br /> this report. <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 City of St.Anthony <br /> 2000 Street&Utility Improvement Project ,_S_B <br /> Feasibility Report <br /> eAr� <br /> WSB Project No. 1065.25 <br /> 1 Page 11 <br />