PHASE ONE: 1999 CONSTRUCTION <br /> • A. Bid Item One: Northeast Parking Lot and Drive and North Fire Road. <br /> Reconstruct the Northeast Parking Lot and Drive and North Fire Road as shown on the <br /> drawings. Install new 8" diameter ductile iron watermain pipe, fire hydrants, and gate <br /> valves where shown. Tie into the existing St. Anthony Village watermain. The depth of <br /> the watermain shall be a minimum of 7' below new finished grades. Excavate the <br /> existing bituminous, base aggregate, sod, topsoil, and/or subsoils to a depth of 12.5" and <br /> replace with 4.5" of bituminous over 8" of base aggregate for the Fire Road pavement <br /> section. Excavate the existing bituminous, base aggregate, sod, topsoil, and/or subsoils <br /> to a depth of 11" and replace with 3" of bituminous over 8" of base aggregate for the <br /> Northeast Parking Lot pavement section. In areas where fill is required, only remove the <br /> existing bituminous pavement, leaving the base aggregate in place. Place and compact <br /> additional base aggregate, as required, to achieve new finished grades. Install new <br /> trench drain structure and adjust the existing catch basin where shown. Construct new <br /> concrete sidewalks where shown. Excavate the existing concrete, base aggregate, sod, <br /> topsoil, and/or subsoils to a depth of 10" and replace with 4" of concrete over 6" of base <br /> aggregate. Construct new 6" by 18" bulkhead curb over 6" of base aggregate where <br /> shown. Regrade all disturbed areas to provide for a minimum of 3" of topsoil and sod. <br /> Stake the sod in place in areas where the slope exceeds a 1' to 4' grade. Stripe the <br /> parking lot as shown. <br /> 0 <br /> B. Bid Item Two: West Fire Road. <br /> Construct the West Fire Road as shown on the drawings. Install new 8" diameter ductile <br /> iron watermain pipe, fire hydrants, and gate valves where shown. Prior to the start of <br /> construction, NSP will remove the overhead power lines and relocate them underground. <br /> Tie into the existing St. Anthony Village watermain. The depth of the watermain shall be <br /> a minimum of 7' below new finished grades. Excavate the existing concrete, base <br /> aggregate, sod, topsoil, and/or subsoils to a depth of 12.5" and replace with 4.5" of <br /> bituminous over 8" of base aggregate for the Fire Road pavement section. Adjust the <br /> existing catch basin structures where shown. Repair the existing concrete sidewalks <br /> where shown. Excavate the existing concrete, base aggregate, and subsoils to a depth <br /> of 10" and replace with 4" of concrete over 6" of base aggregate. Regrade all disturbed <br /> areas to provide for a minimum of 3" of topsoil and sod. Stake the sod in place in areas <br /> where the slope exceeds a 1' to 4' grade. Stripe the parking area as shown. <br /> C. Bid Item Three: West Maintenance Drive. <br /> Rehabilitate the West Maintenance Drive as shown on the drawings. Reclaim the <br /> existing bituminous pavement by pulverizing the material and mixing it with the underlying <br /> base aggregate. Regrade the drive for uniformity and drainage characteristics, then <br /> • thoroughly compact the reclaimed material. The drive will be proof rolled prior to paving <br /> and any soft or unstable materials will be removed and replaced. Pave the drive with 3" <br /> of new bituminous. Regrade all disturbed areas to provide for a minimum of 3" of topsoil <br /> and sod. Stake the sod in place in areas where the slope exceeds a 1' to 4' grade. <br />