My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11142000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 11142000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:18:28 PM
Creation date
12/30/2015 4:18:19 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 11142000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Probable <br /> • Summary of Probable Costs <br /> These costs are estimated as individual improvement projects. Some savings may occur if multiple <br /> projects with similar tasks are completed at the same time. The range of costs will be affected by the <br /> actual scope of work for each project. For reference,construction costs typically rise 5%per year for <br /> inflation,and recently have increased up to 10%per year. <br /> • Liquor Operations Building SAV 2.GAC Plant,and City Hall <br /> Normal Operations and Maintenance Budget Assume$6-$15 per square foot per year <br /> ' • Booster Station,Well Houses.and Water Filtration Plant <br /> Normal Operations and Maintenance Budget Assume$4-$10 per square foot per year <br /> Filtration Plant <br /> New dehumidifier system: $75,000-$100,000 <br /> Building Modifications/maint. (gen'l): $50,000-$100,000 <br /> Chlorine Room <br /> New ventilation system: $300,000 <br /> New loading dock area: $75,000-$150,000 <br /> Warming House modifications <br /> Convert to Parks Dept. storage: $50,000-$100,000 <br /> Booster Station/Well Houses <br /> Aesthetic improvements <br /> Level One: $5,000—$40,000 each building <br /> Level Two: $30,000-$75,000 each building <br /> New Well House(comparison estimate): $150,000-$200,000 <br /> • Fire Station#1 and Public Works <br /> Fire Station#1 (See Section VI—Appendix): $1.7 million <br /> Public Works(See Public Works Space Needs $4.8-$5.3 million <br /> Report dated February 1,2000) <br /> • Liquor Operations Building SAV 1 and Stonehouse <br /> Building Modifications/maintenance(gen'l.) $5,000-$50,000 <br /> ' 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.