My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11122002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 11122002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:59:20 PM
Creation date
12/30/2015 7:59:13 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 11122002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? 31 � <br /> WSB J <br /> �c Associates,Inc. <br /> November 7, 2002 <br /> Honorable Mayor, City Council, and Staff <br /> c City of St. Anthony Village <br /> 3301 Silver Lake Road NE <br /> St. Anthony Village, MN 55418-1603 <br /> „ Re: Sanitary Sewer and Water System Recommended Improvements <br /> City of St. Anthony Village <br /> WSB Project No. 1065-69 <br /> Dear Mayor, City Council, and Staff: <br /> This letter is a follow-up to your October 22, 2002 Council Meeting in regards to the <br /> findings of the Sanitary Sewer And Water Studies. To further clarify the needs.for <br /> improvements within the City of St. Anthony Village, these projects have been divided <br /> into immediate maintenance concerns, nonrecurring maintenance projects and <br /> development driven projects. These projects are classified as follows: <br /> I. Immediate Maintenance Needs <br /> r <br /> C The projects, which require immediate maintenance, are those projects, which, if <br /> failure occurs, would interrupt service of the sanitary sewer or water systems within <br /> ��. the Village. These projects are as follows: <br /> Recommended Im rovements Pretiminary Opinion of Probable Cost <br /> 1. Replacement of the sanitary Sewer <br /> System South of 27`I'Avenue to the <br /> City of Minneapolis. $613,000 <br /> 2. Construct 10-inch water main loop at <br /> Kenzie Terrace $429,000 <br /> 3. Renovate the Chemical Room at the <br /> t water treatment facility. $933,000 <br /> t: 4. Improve electrical service and motor <br /> 4 <br /> controls at Well Houses No. 3, 4, and <br /> 5• $454,000 <br /> 415 Olson Total Cost of Improvements $2,429,000 <br /> Memorial Highway' <br /> iuit�.300 <br /> Minneapolis <br /> inhesota <br /> 2 <br /> 7 (541.4800 <br /> 763,541 1700 FAX Minneapolis • St. Cloud • Equal Opportunity Ern 6yVWIN\1065-69\110702-hmcc.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.