My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11122002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 11122002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:59:20 PM
Creation date
12/30/2015 7:59:13 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 11122002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor, City Council and Staff 32 <br /> City of St.Anthony Village <br /> November 7,2002 <br /> Page 2 of 3 <br /> II. Water and Sewer System Nonrecurring Maintenance Improvements <br /> These improvements are necessary to be completed to the sewer and water system <br /> but are not of a nature, which will interrupt service in the near future. These <br /> improvements are listed below along with the Opinion of Probable Cost: <br /> Water and Sewer System Improvements Preliminary Opinion of Probable Cost- <br /> 1. Prepare water security strategy plan. $10,000 <br /> 2. System-wide controls and telemetry <br /> improvements. $285,000 <br /> 3. Televise sanitary sewer lines in Kenzie <br /> Terrace Area. $5,000 <br /> 4. Continue to identify and eliminate <br /> sources of inflow and infiltration to the <br /> sanitary sewer system. $20,000/annually <br /> 5. Construct closed-loop booster pump <br /> station to serve the area near Rankin <br /> Road and 32°a Avenue $729,000 <br /> Total Cost of Improvements $1,049,000 <br /> 111. Development Driven Improvements <br /> There are a number of recommended improvements, which are anticipated to be <br /> needed as a result of development either at Apache Plaza or in the Southern portion <br /> of St. Anthony in the vicinity of Kenzie Terrace. These projects are: <br /> Development Driven Improvements Preliminary Opinion of Probable Cost <br /> 1. Construct new trunk sanitary sewer <br /> line and increase the capacity of the <br /> Foss Road lift station to serve <br /> Apache Plaza redevelopment. $1,580,000 <br /> 2. Rewire and re-pipe High Service <br /> Pumps No. 3 and 4. $537,000 <br /> 3. Provide Additional water main <br /> looping in the Kenzie Terrace area. $592,000 <br /> 4. Add a fifth High Service Pump to the <br /> distribution system. $420,000 <br /> Total Cost of Improvements $5,568,000 <br /> F:I WPWIM 1065-691110702-hmcc.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.