My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11151994
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1994
>
PL PACKET 11151994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:28:58 PM
Creation date
12/30/2015 5:28:49 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1994
SP Name
PL PACKET 11151994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Regular Meeting Minutes <br /> October 18, 1994 <br /> Page 9 <br /> 1 Faust inquired as to who piled that snow there and asked if it would be difficult to congregate the <br /> 2 snow elsewhere. <br /> 3 Cavanaugh reported that C.W. Houle and Co. is retained to plow the snow. He stated that it <br /> 4 would be cost prohibitive to truck the snow to another location. <br /> 5 Beduhn explained that due to hydraulics, it is not feasible to pick up water and get it to the pond. <br /> 6 He again stated that there were different options available to treat the water. He presented a chart <br /> 7 which showed examples and their relative costs. Each example escalated in cost as it became <br /> 8 more extensive. He stated that there had been discussions and meetings with the Rice Creek <br /> 9 Watershed District regarding regional plan studies but no plans had been made at this time to <br /> 10 install further drainage. <br /> 11 Finn stressed that this may be an opportunity to look at other avenues of drainage, since the area <br /> 12 would be under construction. <br /> 13 Gondorchin assured Finn that his points were well taken. He stated that they would be included <br /> 14 in the meeting minutes and would be read by both the City Council and the City Engineer. <br /> 15 Makowske, Faust, Bergstrom, and Thompson indicated support for the proposed concept and <br /> design. Thompson noted that he still would like to see an entrance through the stores directly to <br /> 17 the mall. <br /> 18 VI. MISCELLANEOUS. <br /> 19 A. Planning Commission Terms Expiring December 31, 1994. <br /> 20 Chair Gondorchin opened the discussion on the expiration of Planning Commission members <br /> 21 terms. He reminded any member whose term was expiring that their intent to serve must be <br /> 22 submitted in writing before the deadline. The positions are open to residents of St. Anthony an <br /> 23 article has been placed in the City Newsletter. <br /> 24 VII. COMMISSIONERS COMMENTS. <br /> 25 A. Chair <br /> 26 Chair Gondorchin inquired as to the sidewalk reconstruction on 37th and Stinson. He also asked <br /> 27 about the blacktop walk at the athletic field. <br /> 28 City Manager Morrison related that he was not aware of any projected sidewalk reconstruction <br /> 29 but that he will inquire and report back. <br /> B. Commissioner <br /> 1 Franzese reported her attendance at a meeting of the Hennepin County Parks Committee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.