Parks Commission Meeting Minutes <br /> January 29, 2001 <br /> Page 5 <br /> 1 Mr. Hartman stated the building size will probably not exceed this threshold. The Commission <br /> 2 agreed. Mr. Kost stated their design will just identify the pad and they will bring the sewer and <br /> 3 water within five.feet of the building'so the building contractor can make the connection. Mr. <br /> 4 Kost stated he will prepare a site plan which Mr. Hartman can provide to the Commission. <br /> 5 Anderson suggested the subcommittee meet again to address the types of groups that will use this <br /> 6 facility, peak attendance, need for picnic tables, etc. He stated he thinks this concept may include <br /> 7 more covered space than is needed. Once those issues are identified, Ms. Olivier will be better <br /> 8 able to determine the size of building which meets that need. <br /> 9 Skrivseth reviewed the current size of programs and estimated an attendance of at least 40 <br /> 10 children. <br /> 11 Zurbey stated he thinks the size of the concession stand and bathrooms (with double vanities) is <br /> 12 too large. <br /> 13 Jindra stated she thinks there is plenty of picnic space available. Skrivseth stated the picnic areas <br /> 14 are rented out every summer weekend. <br /> 5 The Commission agreed that the shelter will not exceed 2,240 square feet. <br /> 16 Landscape Subcommittee <br /> 17 Jindra stated the Landscape Subcommittee has not yet met. <br /> 18 <br /> 19 Field Subcommittee <br /> 20 Zurbey stated this information gives them a lot if issues to raise with the athletic director. <br /> 21 Jensen stated he has contacted a Senior Parks Designer for the City of St. Paul who deals with <br /> 22 landscaping and trails and is willing to meet with the subcommittee and provide input. <br /> 23 It was decided the Field Subcommittee would meet with this Senior Parks Designer on <br /> 24 Wednesday, January.31, 2001, and to also invite Ted Severson. <br /> 25 Mr. Kost stated the plans can be finalized on February 12th. If approved by the Commission, <br /> 26 then it will take them several weeks to complete the plans. Once the plans are approved, they <br /> 27 will go out for bids. He reviewed the other issues that they can get prices for in case the <br /> 28 Commission wants to consider it for future planning. <br /> 29 Anderson reviewed his meeting with City Staff and BRW and indication that BRW would <br /> 0 3 30 include as many bidding options as possible to allow the Commission to make those decision <br /> 1 once the bids are known. He stated they did drop the bid option for placing drain tile under the <br /> 2 fields. <br />