My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08141990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 08141990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:07:50 PM
Creation date
12/30/2015 8:07:39 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08141990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Council Meeting <br /> July 31 , 1990 <br /> Page 9 <br /> 1 <br /> City documents of importance and other material such as the City <br /> 2 Manager's reports, etc. <br /> 3 <br /> 4 Councilmember Marks advised that the Government Training Service <br /> 5 is conducting some planning meetings. He intends to attend these <br /> meetings. <br /> 7 <br /> 8 B. City Manager Report <br /> 9 <br /> 10 The City Manager advised that Dorothy Fleming has taken the position <br /> 11 of Secretary to the Planning Commission. <br /> 12 <br /> 13 Plans for concrete repair were prepared by Maier Stewart. The City <br /> 14 Manager showed these plans to the Council . He stated that bids are <br /> 15 presently being sought and should be back some time this week. <br /> 16 <br /> 17 Progress on the treatment plant was delayed as steel was not available <br /> 18 on a timely manner. The steel has been delivered and the City Manager <br /> 19 stated that this project is moving along. <br /> 20 <br /> 21 The City Manager noted that the Pollution Control Agency has been working <br /> 22 on the filtration plant and it is anticipated it will be in full operation <br /> �3 by September or October. The pipes have been tested for air pressure, <br /> 24 but not for water. <br /> 25 <br /> 26 The Pollution Control Agency has been contacted by the City Manager <br /> 27 regarding the need for replacing the generator at the filtration plant. <br /> 28 He expressed his concern for contamination. This well will be tested <br /> �9 by an engineer. <br /> 30 <br /> 31 It was noted that there is concern regarding Well #{5 and contaminants. <br /> 32 It is nearing the level of contamination. New Brighton is still <br /> 33 pumping. <br /> 34 <br /> 35 Discussion continued regarding acceptable levels of contamination by <br /> 36 various agencies. The Pollution Control Agency's acceptable level is <br /> 37 different from others, especially those of the Health Department. <br /> 38 <br /> 39 The Li:quor Operations Manager advised the City Manager he is still <br /> 40 seeking an organization to sell pull tabs at the Wells. It is the <br /> 41 opinion of the Liquor Operations Manager that this establishment <br /> 42 would benefit in light of the fact that the Tri-City American Legion <br /> 43 is no longer selling pull tabs. Mayor Ranallo will contact the Chamber <br /> 44 of Commerce regarding this matter. <br /> h; <br /> 46 The City Manager stated his intention to attend the ICMA Conference <br /> 47 which is scheduled late in September. He noted he has not registered <br /> 48 at this point in time in view of other considerations. <br /> 49 <br /> • 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.