Laserfiche WebLink
1993 Construction Improvements <br /> August 31, 1992 <br /> Page Three <br /> 3.1 1/2" bituminous overlay on all streets listed. <br /> The scope of engineering services based on the attached agreement for services for <br /> these projects is proposed as follows. (Costs are identified based on a total project <br /> cost of $350,000 reconstruction and overlay for all proposed work.) <br /> 1. Feasibility studies prepared $4,700 <br /> (projects to be assessed to benefited properties <br /> per State Statute 429) . <br /> 2. Prepare contract documents (plans & specifications) 18,810 <br /> 3. Receipt of proposals 627 <br /> .4. Contractor sumittals 313 <br /> 5. Requests for payment 627 <br /> 6. Site visits for construction compliance 3,135 <br /> 7. Progress meetings 313 <br /> 8. Final acceptance 313. <br /> 9. Record drawings 627 <br /> 10. Assessment roll (costs only) 313 <br /> 11 . Construction staking 11,550 <br /> 12. Assessment roll preparation 3.300 <br /> Total estimated engineering $44,628 <br /> It is assumed that no resident inspection is required and that no right of way or <br /> easement acquisition is needed. <br /> The schedule for the upcoming 1993 projects is broken down below: <br /> Proiect Schedule Completion Date <br /> City Council orders feasibility studies September 22, 1992 <br /> City Council receives feasibility studies October 27, 1992 <br />