Laserfiche WebLink
STAFF REPORT <br /> DATE: December 15, 1992 <br /> TO: Mayor and Councilmembers <br /> FROM: Larry Hamer, Public Works Director <br /> ITEM: CHANGE ORDER #1 FOR LOWRY GROVE IMPROVEMENTS <br /> Several problems occurred when the contractor attempted to use the existing 8": stubed-in <br /> water line. The consulting engineer recommended that the City permit a new connection <br /> to the watermain be installed at a cost of $11,450.00. <br /> TCAA.P's permission to extend the contract was obtained. <br /> RECOMMENDATION ' <br /> Recommend the Change Order be granted to install a new waterline to the main line. <br />