My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12221992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 12221992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:20:48 PM
Creation date
12/30/2015 8:20:39 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 12221992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br /> No: One (1) <br /> PROJECT: Lowry Grove Water Main DATE OF ISSUANCE: Dec. 11, 1992 <br /> Improvements <br /> OWNER: St. Anthony Village <br /> (Name, 330ISilv. er Lake Road <br /> Address) St. Anthony, MN 55418 OWNER'S PROJECT NO: 490-013-30 <br /> CONTRACTOR: F.M. Frattalone, Inc. ENGINEER: Maier Stewart & Assoc. <br /> 3066 Spruce Street 9800 Shelard Parkway <br /> St. Paul, MN 55117 Minneapolis, MN 55441 <br /> 612/546-0432 <br /> CONTRACT FOR: Water Main ENGINEER'S PROJECT NO: 490-013-30 <br /> Improvements <br /> "tu are directed to make the following changes in the Contract Documents: <br /> Description: Install approximately 80 l.f. of 161, casing Jack bored and 8" <br /> diameter D.I.P. water main at $85.00 l.f. , wet tap 811 x 10" at $2,200, concrete <br /> road restoration at 1,650.00 and approximately 100 tons class 5 at $8.00. Above <br /> items include traffic control and saw cutting concrete. <br /> Purpose of Change order: Allows direct connection to existing 101, water <br /> main on Kinzie Terrace. Existing cast iron stub not accessible, would require <br /> replacing valve and opening up the concrete road in two (2) locations. <br /> Attachments: (List documents supporting change. ) NONE <br /> CHANGE IN CONTRACT PRICE: GE IN CONTRACT TIME: <br /> M' <br /> g <br /> Original Contract Price 0 'ginal Contract Time <br /> $109, 026. 00 N/\A <br /> day or da e <br /> Previous! C.O. 's No. Net c,\hane. from pr/ev' s <br /> Change Or rs <br /> SNIA N/A <br /> contract Price prior to this C.O. Contract Time ri to this C.O. <br /> $109, 026. 00 NIA X <br /> da or date <br /> Net Increase of this C.O. Net Incr/se of th\is .O. <br /> $11,450. 00 NIA <br /> 'Contract Price with all ct Time with all <br /> 1( <br /> approved C.O. 's approved C.O. 's <br /> c7 <br /> $120,476. 00 N <br /> RE DE APPROVED: APPROVED: <br /> C <br /> by by by <br /> Eng'ineer - Owner G10ontractor/,/' <br /> lormslorder.clg <br />
The URL can be used to link to this page
Your browser does not support the video tag.