Laserfiche WebLink
13 <br /> • • Main Water Filtration Plant <br /> • Required General Improvement Needs: <br /> • New epoxy flooring <br /> • New lighting <br /> • New roofmg and.clerestory windows. <br /> • New and larger exterior doors(for pump removal) <br /> • New dehumidifier system <br /> • Painting(interior walls&ceilings and vessels) <br /> • Potential long-term needs are: <br /> • New roofing(assume replacement every 10—20 years) <br /> • Replace exterior metal panel <br /> • Some form of brick veneer repair(tuckpointing,partial wall replacement,etc.) <br /> • Recommended Improvements: <br /> • There is evidence of some sort of mineral deposits forming at below-grade CMU walls,which <br /> may be caused by high levels of humidity and/or small amounts of water seepage from the <br /> exterior. This condition should continue to be monitored for any changes or appearance of. <br /> damage to the wall. <br /> • Attached BuUdines: <br /> • Chlorine Room: <br /> • Required General Imurovement Needs: <br /> • New epoxy flooring <br /> • Painting(interior) <br /> • Recommended Improvements: <br /> • Construct a loading dock with track,system and double doors for loading and <br /> unloading storage tanks <br /> • • Note: Any modifications listed above(besides paint)may require an upgrade in the <br /> air exchange system <br /> • Warming House: <br /> • Required General Improvement Needs: <br /> • Roof repair/replacement <br /> • New clerestory windows <br /> • New unit heaters <br /> • Recommended Improvements: <br /> • Eliminate access point between warming house and Filtration Plant or provide <br /> additional security <br /> • Convert warming house to Parks and Recreation Department storage <br /> • The Warming House is no longer needed at this location because the hockey <br /> rink has recently been moved. The Parks Department would benefit from the <br /> additional storage created at this site., <br /> ! Liquor Operations Building S 1 and Stonehouse <br /> • Required General Improvement Needs: <br /> • Repair/upgrade the exterior envelope(cracked stucco and brick veneer) <br /> ' • New plumbing and HVAC system <br /> • Correct settlement of building column(s);new flooring(SAV 1) <br /> • Interior cosmetic improvements(Stonehouse) <br /> a• Code compliance upgrades(Stonehouse) <br /> —1• New awning and roofing(Stonehouse) <br /> • Correct settlement of front entry(Stonehouse) <br /> • • Repair water damaged exterior wall and basement(Stonehouse) <br /> • Potential long-term needs are: <br /> • New roofing(assume replacement every 10—20 years) <br /> • Replace/refinish exterior stucco;brick veneer repair <br /> 8 <br />