My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06122001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 06122001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:52:15 PM
Creation date
12/30/2015 7:52:08 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 06122001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 14 <br /> • • . Recommended Improvements: <br /> • The SAV 1 and the Stonehouse are in need of a new,updated look and newer,updated <br /> equipment to maintain its relevance in the competitive market that they are in. The SAV 1 <br /> has a serious functional deficiency in the relationship between storage areas and the location <br /> of its loading dock. The Stonehouse,including the portion serving as storage for SAV 1,has <br /> several physical deficiencies that would require major comprehensive remodeling in order to <br /> extend its useful life.In the event of major remodeling,the costs to correct regulatory issue s <br /> and the potential costs of hidden deficiencies are likely to be as hi-oh as new construction. <br /> The final cost an d time spent remo e g would likely be better new facility <br /> that would serve you better. The o recommendations for this building are to complete <br /> .4 aesthetic,non-structural surface repair(finis es,c tincr roof- ed for <br /> e.`ery3ay use o a aciIity. timate y, .we recommend new construction for SAV 1 and the <br />-4 Stonehouse. <br /> J ' <br /> Fire Station#1 <br /> _.� • Recommended Improvements: <br /> The Fire Station is in need of additional,more functional space. The standard for modem fire <br /> station design includes drive-through apparatus bays;something that is not available with the <br /> current facility. On August 8 and September 12,2000,Joel Hewitt,City Fire Chief,and Jay <br /> '4 Hartman met with Nancy Schultz,SEH,and Jason Zemke to discuss potential courses of action for <br /> the Fire Station. To meet the.current and future.needs of the Fire Department,it is clear that <br /> changes need to occur. <br /> _A • Discussion of Fire Station Remodel: For the following reasons,we recommend against <br /> extensive remodeling improvements within the existing building framework: <br /> • The existing building has fulfilled its life expectancy for its construction type(approx.50 <br /> years plus) . <br /> -� • The original building was not designed to house it fire station <br /> • Current location of building on the site is not ideal <br /> • Sizes of modern apparatus and other new equipment are typically larger than past <br /> - models <br /> • The current Fire Station is approximately 5,400 sf. The actual area needed,assuming <br /> standard circulation efficiencies in planning,is approximately 11,500 sf. If additional <br /> area is added to the existing building,it will likely conflict with other existin <br /> -A site. uses on the <br /> fli <br /> site. Remodeling does not appear to serve this site to its best potential <br /> • Extensive remodeling is often cost-prohibitive <br /> • Often triggers the need to update entire facility to current regulatory requirements: <br /> -� • Electrical wiring,HVAC and exhaust systems,fire access and egress,H.C. <br /> accessibility,etc. <br /> • Often uncovers unknown deficiencies in construction <br /> _ • Hazardous materials,structural damage,etc. <br /> - • Additional costs tend to `snowball' and.drastically increase the cost and scope of the <br /> J <br /> original project <br /> • Construct a New Fire Station: <br /> -'� Therefore,we recommend that a-new.Fire Station is constructed,either on the same site <br /> .. (including modification of e entire site)or relocated to a suitable site within the City,.To <br /> help determine the scope and cost of a new Fire Station,we studied the required space needs <br /> an po en- si a issues or a new ui g. <br /> • Space Needs Report: <br /> To determine the spatial needs of the Fire Department,a summarized Space Needs . <br /> -, Report was generated(see Section VI,Appendix). This report lists the major spaces <br /> needed for a new fire-station;which totals 11,530 square feet. The total site needed for <br /> - this fire station is estimated to be approximately 36,000 square- t.- <br /> -� 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.