My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10222002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 10222002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:59:09 PM
Creation date
12/30/2015 7:59:03 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 10222002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Honorable Mayor, City Council and Staff <br /> St.Anthony Village <br /> October 15,2002 <br /> Page 2 <br /> describing the issues presented to the City in regards to their driveway and a <br /> request from the homeowner for adjustments to their property. <br /> IV. 2001 Street Reconstruction <br /> The street and utility construction is 100% complete. There area number of <br /> warranty issues,which we anticipate to be addressed this fall. These warranty <br /> issues include: <br /> ■ The workmanship on several driveways within the project have been <br /> considered unacceptable. We have met with the Contractor and their <br /> subcontractors concerning the repair of these driveways. If the <br /> driveway repairs are riot completed this fall, they will be completed <br /> next spring. <br /> ■ The maintenance access to the Harding Street Holding Pond off of <br /> 30`h Avenue will be regraded and sodded this fall to eliminate the <br /> ponding that is present. <br /> ■ The landscaping Contractor for the Harding Street Holding Pond has <br /> continued, and will continue through next year, replacing materials <br /> within the Harding Street Holding Pond such as dead trees, shrubs, <br /> and plant materials.. <br /> r <br /> ■ The seeding Contractor for the Harding Street Holding Pond will <br /> continue to maintain the vegetation in the pond for the next year and <br /> a half. This year's maintenance included mowing and replacement <br /> and reseeding of areas where erosion had occurred, and where <br /> vegetation has not been established. <br /> ■ The landscape Contractor is anticipated to repair the fence along the <br /> east side of the Harding Street Holding Pond within the next couple <br /> of weeks. <br /> V. 2002 Street Reconstruction <br /> Utility work is 100% complete. The street reconstruction up to the base course <br /> of asphalt has been completed. The second lift, or wear course, of asphalt will <br /> be laid next summer. <br /> Work that remains to be completed on the 2002 Street Reconstruction project <br /> includes restoration of driveways and yards. The Contractor has brought in new <br /> topsoil, and we are still anticipating sod around the end of October, first part of. <br /> November, weather permitting. <br /> FAWPWQV\1065-7N01502 hmc.rtf ��y <br />
The URL can be used to link to this page
Your browser does not support the video tag.