My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07132004
StAnthony
>
City Council
>
City Council Packets
>
2004
>
CC PACKET 07132004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:51:17 PM
Creation date
12/30/2015 7:51:09 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 07132004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes 03 <br /> June 22, 2004 <br /> Page 3 <br /> 1 simplify the process rather than having the Planning Commission come forward with a variance <br /> 2 for each change. <br /> 3 <br /> 4 Ms. Tillman indicated that this idea was discussed by the Planning Commission at the last <br /> 5 meeting as well. Mayor Hodson asked Ms. Tillman to bring the idea back to the Planning <br /> 6 Commission for further discussion. Ms. Tillman indicated that she would. <br /> 7 <br /> 8 Motion by Councilmember Horst, seconded by Councilmember Faust, Adopting Resolution 04- <br /> 9 048, Approving Amendment to the Comprehensive Sign Plan for the St. Anthony Shopping <br /> 10 Center. <br /> 11 <br /> 12 Motion carried unanimously. <br /> 13 <br /> 14 2. Resolution 04-049, Approving Silver Lake Village Final PUD and Final Plat for <br /> 15 Housing and Rental—Perry Thorvig Dahlgren, Sharlow and Uban presenting, <br /> 16 Perry Thorvig, City Planning Consultant on the Silver Lake Development, addressed the Council <br /> 17 stating it was required that the Planning Commission review the final plans for the Hunt/Pratt <br /> 18 condominium development, and make a recommendation to the City Council to approve, <br /> 19 approve with suggested modifications or reject the plans. <br /> 20 <br /> 21 Mr. Thorvig stated that the criterion the Planning Commission used to make the <br /> 22 recommendation was consistency of the final plans with the concept that was <br /> 23 approved last September. <br /> 24 <br /> 25 Mr. Thorvig noted the concept(Preliminary Development Plan), that was approved <br /> 26 last year, is reflected in the Design Framework Manual dated August 19, 2003, and <br /> 27 in the Preliminary Site Plan dated August 8, 2003. He added they show the four <br /> 28 condominium buildings being located north of the Dominium rental building. <br /> 29 <br /> 30 Mr. Thorvig stated if approved, the developer expects to begin construction in the fall. <br /> 31 <br /> 32 Mr. Thorving continued with outlining the findings of consistency of current <br /> 33 proposal with preliminary development plan which include the following: <br /> 34 <br /> 35 Building Location and Lot Coverage—The final plans show four modified U- <br /> 36 shaped buildings facing each other. A central open space spine separates the <br /> 37 buildings. The lot coverage and locations are the same as in the preliminary plan. <br /> 38 <br /> 39 Building Appearance-The height of the building is four stories. Height varies from <br /> 40 a typical 50 foot height to a maximum of 60 feet in some end locations. The height <br /> 41 has remained the same as in the preliminary plan. The buildings' exterior appearance <br /> 42 is also basically the same. The design details show brick facing on the lower three <br /> 43 floors with stucco/stucco board on the upper floor. The exterior materials are intended <br /> 44 to be complimentary to the commercial developments in the PUD and to the <br /> 45 Dominium building. The roof will be flat with parapet walls. <br /> 46 <br /> 47 Building Density- The number of apartment units has decreased from 256 to 251. <br />
The URL can be used to link to this page
Your browser does not support the video tag.