My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08151989
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1989
>
PL PACKET 08151989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:40:02 PM
Creation date
12/30/2015 3:39:55 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1989
SP Name
PL PACKET 08171898
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> contained in their petition'' for variance and attachments . <br /> Responding to a question by Chair Madden , VanderHeyden <br /> advised the Commission that , although the underground tanks <br /> have been removed from 'the property, the City presently has <br /> no information available to it concerning the PCA' s timetable <br /> for testing the soil . <br /> Commissioner Hansen referred Acting City Manager to a letter <br /> sent to the developers by the City about the condition of the <br /> lot and asked whether any response had been received. <br /> VanderHeyden said that META' s presence at this hearing was in <br /> response to that letter concerning a zoning violation. <br /> Daniel Tyson, Attorney for META Operating Limited Partnership <br /> Mr. Tyson reviewed META' s request to build a gravel parking <br /> lot versus a concrete or asphalt parking lot as required by <br /> zoning ordinance based on the fact that construction of a <br /> gravel parking lot is the optimum use of the property at this <br /> time . <br /> Mr. Tyson noted that Renzington is now nearly 100 percent <br /> occupied, and that additional parking accommodations are <br /> necessary. Mr. Tyson reminded the Commission that overflow <br /> parking was discussed at the time of the condominium <br /> project ' s original approval , but because the occupancy rate <br /> was low for such a long time the overflow parking situation <br /> was never addressed and resolved. Additionally, META ' has <br /> identified no long-term tenant for the property, <br /> Mr . Tyson reviewed the fact that the property had at one time <br /> been the site of a service station whose underground storage <br /> tanks had leaked, which fact was discovered in September 1987 <br /> when site excavation was undertaken. At that time, the PCA <br /> was called in to investigate the soil condition. Mr. Tyson <br /> told the Commission that he had met last week with Delta <br /> Environmental Consultants and a representative of the PCA to <br /> discuss the hydrologist ' s report which identifies required <br /> corrective measures , specifically, monitoring wells and <br /> additional testing. <br /> Mr. Tyson stated that the nature and scope of the testing and <br /> resolution of the soil pollution problem is undetermined at <br /> this time, and that META has concluded that constructing an <br /> asphalt or concrete parking lot would be a waste of money <br /> considering the fact that it might be demolished in the <br /> .course of testing and cleaning the soil . <br /> Mr. Tyson claimed that META is subject to undue hardships •� <br />
The URL can be used to link to this page
Your browser does not support the video tag.