Laserfiche WebLink
Planning Commission Regular Meeting Minutes - <br /> May 20, 1997 <br /> Page 12 <br /> 1 Chair Bergstrom stated he liked the signage on the office building at Highway 694 and <br /> 2 Central Avenue. He questioned if the proposed signage would accomodate logos. <br /> 3 Commissioner Makowske stated he felt the proposal was the best he had seen thus far. <br /> 4 Chair Bergstrom instructed Mr. Wirth to work with City Staff to develop a comprehensive <br /> 5 sign plan which included specific parameters for the size, height, color, font and type of <br /> 6 lettering, lighting, logos, and maximum sign length to be submitted at the June Planning <br /> 7 Commission meeting. <br /> 8 Commissioner Gondorchin asked if this would result in a change in the City Ordinance. <br /> 9 Ms. Moore-Sykes noted it would and that she would work with the City Attorney to develop <br /> 10 specific language to address this change. <br /> 11 Mr. Wirth asked if the Planning Commission approved of the inclusion of logos in the <br /> 12 signage. <br /> 13 There was Commission consensus to approve of the inclusion of logos if they were consistent <br /> 14 with the shape and size of other lettering of the sign. <br /> 15 6. Italian Restaurant Proposal -- Pizza Hut Site. <br /> 16 Ms. Moore-Sykes reported Jake Cadwallader and his client Michael Monrad own the gas <br /> 17 station area and have purchased the Pizza Hut building. Their intention is to extend the <br /> 18 existing building and connect it to the other building and create an Italian-style restaurant <br /> 19 which would serve 3.2 beer and wine. Staff has highly suggested they subdivide the property <br /> 20 and replat to clean up the title. The proposal would not require a variance and.,there is <br /> 21 sufficient parking on the site. There would also be a small section of the building remaining <br /> 22 which could be used as retail space. Ms. Moore-Sykes stated she called the applicant and <br /> 23 asked them to attend the meeting this evening but did not receive a response. She stated she <br /> 24 will continue to attempt to contact the owner. <br /> 25 Chair Bergstrom asked what issues may trigger a Public Hearing for this proposal. <br /> 26 Ms. Moore-Sykes indicated a replat or a zero lot line would require a Public Hearing. <br /> 27 7. Comprehensive Plan Task Force Update. <br /> 28 Public Information Meeting, Parks -- June 2, 1997 <br /> 29 Ms. Moore-Sykes reported Bob Koss will be present to look at a plan for all the parks in the <br /> 30 City. This will be an open meeting. The meeting will be video-taped and minutes will be <br /> 31 taken to be available for anyone who is not able to attend. <br /> 32 Draft Review of Comprehensive Plan -- July 16, 1997 <br />