My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08212001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 08212001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:39:07 PM
Creation date
12/30/2015 7:39:01 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 08212001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r.. <br /> Corporate Campus/Residential <br /> ' Redevelopment Concept <br /> > , <br /> . f,;.a ��,►• The goal of the redevelopment concept is to provide St.Anthony Village with a strong base <br /> 1 of well paying jobs in a multi-building corporate campus facility on the site of the existing <br /> —'— � Apache Plaza.A new residential neighborhood would offer a variety of new housing choic- <br /> es to existing residents of St.Anthony. <br /> FEATURES COULD INCLUDE- <br /> About 500,000 square feet of corporate offices in multiple buildings and a 5-level parking <br /> facility on the east half of the site. <br /> • 75,000 square feet of retail development. <br /> •About 400 housing units,including townhomes,senior high rise and multiple family housing. <br /> • Tree-lined boulevard crossing through the site and connecting the two ends of 39th Avenue. <br /> •A new road network within the site providing access to residences and businesses. <br /> •�: •A central park that will act as a focal point of the residential and corporate campus portions <br /> ••� <br /> -—a- r of the development and serve as a buffer between the office and residential area. <br /> •A series of trails,sidewalks and open spaces linking the site internally and linking it externally <br /> to surrounding neighborhoods and the new nearby Hennepin Parks Regional facility. <br /> • Improved water quality of Silver Cake through storm water retention and filtration facilities. <br /> • Metro transit service to the site with bus shelters. <br /> TENTATIVE <br /> NEXT STEPS -SCHEDULE <br /> Fall 2001 — City develops and issues a request for pro- develop their proposal into a detailed plan and seek <br /> posals for the redevelopment concepts from developers. public input for the plan. . <br /> Late 2001/Early 2002 — City reviews proposals and Summer/Fall 2002— City enters final development <br /> interviews developers, subjecting the concepts to further agreement with developer. <br /> evaluation and identifying any potentially viable devel- For more information about the Northwest Quadrant <br /> opment proposals. Redevelopment Planning Study, contact Susan Henry, <br /> Early 2002 — City selects developer(s) for preliminary Assistant City Manager, at 612-789-8881, or for <br /> development phase. In this phase, the developers will general updates, call the Hotline at 612-706-1350. <br /> UgWO.LSf1D -IVISOd _lVl_LN3QIS3d <br /> * * S S M 2i D 9 <br /> sn'u w'i(u a y t u v-1 S'U"x%m <br /> 1899-68L(Z19) <br /> 8ibSS NN'.(uogPuy-is <br /> bOzz'ON iluuad eo <br /> NN'nlodeauuy1 P 21 a)(Zt 13A i 1S io££ <br /> QIvd a <br /> a8etsod Syl <br /> Q LS INS2id <br />
The URL can be used to link to this page
Your browser does not support the video tag.