My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 06111984
StAnthony
>
City Council
>
City Council Minutes
>
1984
>
CC MINUTES 06111984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:02:16 PM
Creation date
12/30/2015 6:02:14 PM
Metadata
Fields
SP Box #
21
SP Folder Name
CC MINUTES AND AGENDAS 1984
SP Name
CC MINUTES 06111984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> The Manager said the request from the Minneapolis Park and Recreation <br /> Board for Minneapolis water and sewer connections for the Gross Golf <br /> • Course Clubhouse would be deferred to the next Council meeting, June 26th. <br /> Mr. Hamer had submitted a lengthy report- on the operations of the City <br /> water system and he advised it- would probably be necessary for the City <br /> to implement an odd/even sprinkling. ban for the City this summer, <br /> especially since Superfunding would be available . to the City only if <br /> water conservation measures are taken. <br /> Motion by Councilman Makowske and seconded by Councilman Enrooth to <br /> authorize the City Manager and Public Works Director to take whatever <br /> water conservation measurethey believe necessary for the summer. <br /> Motion carried unanimously. <br /> In his: June 11th memorandum, Mr. Childs had listed the actions which <br /> the Council should take to implement the Roseville water connection. <br /> Mr. Hamer had tabulated the four bids for the watermain connection <br /> construction on 29th Avenue N.E. which had been taken June 4th and <br /> advised that the lowest had been for $127,090 from R. W. Moore. The <br /> Public Works Director said the engineers had underestimated the cost <br /> of the meter manhole and had estimated the project cost to be $105 ,000 , <br /> which, Mr. Childs: said, could probably be offset somewhat, if the City <br /> is able to rent or borrow a meter from St. Paul, which the R. W. <br /> Moore company has agreed to modify their bid to exclude. Councilman <br /> Ranallo commented that the final cost would be much lower than an <br /> • earlier proposal-' from the water softener companies to rent their <br /> equipment. Mr. Childs indicated state officials had urged the City to <br /> apply for state superfunds with an adjustment to be made later for <br /> any federal monies , if such funds are made available to the City . <br /> Motion by Councilman Enrooth and seconded by Councilman Ranallo to <br /> adopt the resolution which accepts the proposal from Short-Elliott- <br /> Hendrickson, Inc. for the preparation of plans and specifications for <br /> the construction of the watermain along 29th Avenue N.E. to provide <br /> temporary water service to a portion of St. Anthony from the Roseville <br /> system at a cost of $7,000 , which would be reimbursed from the state <br /> Superfund. <br /> RESOLUTION 84-028 <br /> A RESOLUTION ACCEPTING A PROPOSAL FOR PLANS AND <br /> SPECIFICATIONS FOR THE CONSTRUCTION <br /> OF A WATERMAIN INTERCONNECTION <br /> Motion carried unanimously. . <br /> Motion by Councilman Enrooth and seconded by Councilman Ranallo to <br /> adopt the resolution which .awards the contract for the watermain con- <br /> struction on 29th Avenue N.E. to R. W. Moore for an amount not to <br /> exceed $127, 090 with the total project cost not to exceed $134 ,090 , <br /> plus attorney 's fees , if the City is unable to rent or borrow an 8 inch <br /> • meter manhole from St. Paul, and subject to St. Paul and Roseville agree- <br /> ing to the connection of the Roseville water system to a portion of <br /> St. Anthony, as proposed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.