My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 09231986
StAnthony
>
City Council
>
City Council Minutes
>
1986
>
CC MINUTES 09231986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:52:03 PM
Creation date
12/30/2015 5:52:00 PM
Metadata
Fields
SP Box #
21
SP Folder Name
CC MINUTES AND AGENDAS 1986
SP Name
CC MINUTES 09231986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City Attorney and Bulletin news writer left the meeting during the recess <br /> • from 9:02 to 9: 15 P.M. when the Mayor reconvened the meeting to review the plans <br /> and specifications for the Stonehouse reconstruction project with Wil Johnson <br /> and Stephen Patrick of BWBR Architects. <br /> Stonehouse Reconstruction Discussion <br /> With Architects <br /> Council considered: <br /> Financing <br /> Estimated $1 ,000,000 bond, 8y'% interest for 15 years with annual service payment <br /> approximately $120,000. <br /> Deduct Alternates - to be considered in event of bid overruns. Order of preference <br /> to be decided at that time. <br /> a. basement under new liquor store (if SAV #2 adversely effects SAV #1 ) ; <br /> b. wood screen fence at roof; <br /> C. g:reeixhbuse.= type additions to on-sale; <br /> d. kitchen, (current market demands restaurant) . <br /> Site and Elevation Plans (further considerations) <br /> a. setback variance needs to be considered; <br /> b. relocation of utility and water lines add-ons, catch basin and PVC line to <br /> avoid storm sewer drainage, needed; <br /> c. demolition and restructuring old City Hall for Fire Department to be discussed at <br /> City Council/staff goal setting meeting; <br /> d. Speakeasy bar to be left intact except sprinkler system necessary for all <br /> occupied spaces; <br /> e. handicapped ramps and access to all first floor except two step rise in bar <br /> area; <br /> f. luminous sign on building replacing old non-conforming pylon.. <br /> Insurance <br /> City needs to make sure certain coverages are in place. <br /> Hazardous Waste Material Removal <br /> City's responsibility. <br /> Proposed Time Schedule <br /> • *October 6 final concept and content plan approval by staff <br /> *October 7 advertising for bids <br />
The URL can be used to link to this page
Your browser does not support the video tag.