Laserfiche WebLink
CHANGE ORDER NO. 1 • <br /> CHANDLER DRIVE CONCRETE PAVEMENT REHABILITATION <br /> CITY OF ST. ANTHONY <br /> DESCRIPTION <br /> Chandler Drive is a concrete surfaced roadway with concrete pavement in need <br /> of rehabilitation or replacement. When the concrete removal began it was <br /> determined that additional concrete.pavement not shown on the plans is <br /> necessary for removal or repair to completely rehabilitate the concrete <br /> pavement on Chandler Drive. <br /> PURPOSE OF CHANGE ORDER <br /> The purpose of this change order is to add to the total contract price the <br /> additional cost of removing and replacing the additional concrete pavement <br /> and repair the concrete pavement left in place. The following is a listing <br /> and description of each bid item increased or decreased from the Contract <br /> Bid Quantity. <br /> Item No. 1 <br /> The spot surface repair (Type B-2A) quantity will be increased from 20 SF to 80 <br /> SF. The purpose of the increased quantity is to patch the areas on the concrete <br /> pavement where the panels will not to be replaced. This means an increase in the <br /> contract price of $1,500. <br /> Item No. 2 <br /> The contraction joint repair (Type C-3A) bid quantity will be increased from 238 <br /> lineal feet to 251 lineal feet. The increase in contraction joint repair is due <br /> to the increased concrete pavement replaced. This means an increase in the <br /> contract price of $494. <br /> Item No. 3 <br /> The concrete pavement (Type D) bid quantity will be increased from 2675 square <br /> yards to 3290 square yards because -additional concrete pavement, other than <br /> shown on plans, needs replacement. This means an increase in the contract price <br /> of $22,140. <br /> Item No. 4 <br /> The structural concrete high early strength quantity will be increased from 62 <br /> square yards to .130 square yards. The purpose of this was to provide vehicle <br /> access to business and apartment complexes as soon as possible after the <br /> concrete was paved. This means an increase in the contract price for structural <br /> concrete high early of $680. <br /> • <br />