My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10221991
StAnthony
>
City Council
>
City Council Packets
>
1991
>
CC PACKET 10221991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:13:36 PM
Creation date
12/30/2015 8:13:31 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 10221991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Item No. 5 <br /> The 3/8" joint repair (Type A-1 mod.) bid quantity will be increased from 1960 <br /> lineal feet to 2190 lineal feet. The purpose of the increased quantity is to <br /> cut and seal the joints in the additional. concrete pavement replaced. This <br /> means an increase of $230 in the contract price. <br /> Item No. 6 <br /> The 3/8" longitudinal joint repair (Type A-5) bid quantity will be increased <br /> from 2300 lineal feet' to .2942 lineal feet. The increased quantity was caused by <br /> the additional concrete pavement replaced and the concrete curb saved in certain <br /> areas, creating a joint that must be cut and sealed. <br /> Item No. 7 <br /> Seal concrete pavement (silicone) bid quantity was increased from 163 pounds to <br /> 270 pounds. The increased quantity was caused by the additional joints in the <br /> additional concrete pavement placed- and changing the centerline joint from MnDOT <br /> 3723 material to silicone. The increased quantity means an increase in contract <br /> price of $802.50. <br /> Item No. 8 <br /> The 8" concrete driveway pavement bid quantity will be increased from 40 square <br /> yards to 270 square yards. The purpose of this is to provide driveway aprons <br /> • behind the curb for the commercial property and restore the driveway to the <br /> Public Works building. This means an increase in contract price of $8,280. <br /> Item No. 9 <br /> The sodding quantity will be increased from 1000 square yards to 600 square <br /> yards. The purpose of this is to restore the area from the curb to the <br /> bituminous pavement in front of the Berger Transfer property. This mans an <br /> increase in contract price of $2,400. <br /> Item No. 10 <br /> The subgrade excavation bid item was not needed because after testing, it was <br /> found that the subgrade met the requirements in the specifications. Therefore, <br /> 1350 cubic yards of subgrade excavation can be deleted from this contract, <br /> totaling $8,100. <br /> Item No. 11 <br /> The dowel bar assembly bid quantity will not be needed. The dowel bar <br /> assemblies were eliminated because the existing concrete pavement was not <br /> constructed with dowel bars at the transverse joints. This means a deduction <br /> in the contract price of $4,600. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.