My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01281992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 01281992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:14:50 PM
Creation date
12/30/2015 8:14:43 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 01281992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. <br /> c � <br /> giggil <br /> Barr <br /> Engineering Company <br /> 8300 Norman Center Drive <br /> Minneapolis.MN 55437-1026 <br /> Phone: (612)832-2600 <br /> Fax: (612)835.0186 <br /> January 20, 1992 <br /> Mr. Larry Hamer <br /> Director of Public Works <br /> City of St. Anthony <br /> 330.1 Silver Lake .Road <br /> St. Anthony, MN 55418 <br /> Dear Mr. Hamer: <br /> At your request, I have solicited proposals for grouting and patching of the <br /> existing RCPA pipe upstream of the new outlet at Highcrest Street. I solicited <br /> referrals from persons I know who have recently hired specialty contractors to <br /> do this type of work. I got three names: <br /> Solidification Incorporated <br /> • D.D.C. Contracting Incorporated <br /> J. T. Trout Corporation <br /> I met with each contractor to discuss the work and administrative concerns. <br /> The earliest the contractors could all get their proposals to me was January 14, <br /> 1992. <br /> I had requested that the proposals be formatted to include a lump sum price <br /> to mobilize, prepare the site for grouting, grout up to 2 cubic yards and also <br /> provide a cost per cubic foot for quantities of grout in excess of 2 cubic yards. <br /> I also asked for a cost per square foot to repair the spoiled surface on the base <br /> of the pipe. Repair was to be accomplished using Sikatop 122 repair mortar and <br /> sawing edges. <br /> The proposals and our reaction to each proposal follows: <br /> Solidification Incorporated <br /> With 15% Contractor Fee <br /> Grouting for 3 cubic yards $2,924 $3,363 <br /> Grouting for 5 cubic yards $3,572 $4,108 <br /> I was informed verbally that these prices are good only near the manhole. <br /> No price was offered for concrete repair. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.