My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01161996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 01161996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:27:23 PM
Creation date
12/30/2015 6:27:16 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 01161996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01/02/96 17: 10 ^p612 937 5522 «EST%VOOD PRO SN'S Lg'005 <br /> Page 3 <br /> DRAFT-- Silver Lake Center EAW <br /> January 2, 1996 <br /> Table 1: Development Summary <br /> BuildingAcreage Parking <br /> Proposed Use Phase Area s.f, a x. Stalls <br /> Cub Foods 1 75 200 9.23 553 <br /> Cub Foods Addition 2+ 12,600 0 0 <br /> b Building Supply. 2+ 74,000 11.40 300 <br /> Herberger's 2+ 80,000 7.48 400 <br /> Retail 1 7,500 1.14 59 <br /> Gas/ConvJCar Wash 1 7,500 1.51 25 <br /> Restaraunt 2+ 7,800 0.73 30 <br /> Video 2+ 7,000 1.08 77 <br /> oil Change 2+ 4,000 1.10 29 <br /> Pet Supply 2+ 22,000 3.14 110 <br /> Liquor 2+ 9,000 0.89 55 <br /> New Market Lot ? 0 4.96 0 <br /> Stormwater Ponds A-C 1 0 1'09 0 <br /> Stormwater Pond D 2 . 0 2.41 0 <br /> Pond Landscaping 1-2+ 0 . 2.68 0 <br /> 306,600 48.84 1638 <br /> ' <br /> This use is proposed to occur within the 9.23-acre Cub Foods site <br /> 2 Approximately 43,000 a.f.of the Herberger's building Includes renovation of existing <br /> ? facilities <br /> Combine this lot acreage with the existing uses(First Bank,Taco Bell,and Tires Plus— <br /> approximately 1.96 acres)to obtain the total site area of 50.8 acres. <br /> �,brb <br /> Provide a 50 or fewer word'abstract for use in Fn6 Monitor notice:- <br /> Silver Lake Center involves redevelopment of Apache.Plaza,and Is ultimately planned to Include 285,600 <br /> s.f.of new/renovated retail space and four.stormwate[ponds. Initiating In spring of 1996,Phase 1 will <br /> include partial demolition of the existing mall,construction of a 75,200 s.f.Cub Foods,development of <br /> two lots,and installation of three Stormwater-pohds....- <br /> 7. Project Magnitude Data <br /> Total Project Area(acres) 50.8* or Length(miles) WA <br /> Commercial/Industrial/Institutional Building Area(gross floor space) <br /> Total 306,600 square feet; <br /> Indicate area of specific uses' <br /> Manufacturing <br /> Office <br /> Retail 306 600 Other Industrial <br /> Warehouse Institutional <br /> Light Industrial _ Agricultural <br /> Other Commercial (specify) <br /> Building Height(s) <br /> The total project area Includes the existing properties(First Bank,Taco Bell,and Tires Plus)that will <br /> remain in place during site redevelopment. The gross floor space includes the 43,000 s.f.renovation for <br /> the Herberger's. <br /> Westwood Professional Services,Inc. ,�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.