My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05082001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 05082001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:51:57 PM
Creation date
12/30/2015 7:51:51 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 05082001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> Park Commission Recommendation <br /> ® The Parks Commission analyzed the bids in detail. The commission's recommendation is to to <br /> one of the following: <br /> 1. Accept the bid from Veit and Company with modifications based on accepting a combination <br /> of the add and deduct alternates including the following: <br /> Base Bid: $1,768,632.78 <br /> Alt.L Irrigation for City Hall area: $30,000 <br /> Alt. 3 1/2 Basketball Court: $6,088.21 <br /> Alt. 9. North Parking &Earthwork $89,078.55 <br /> Allowance for"Wet-Deck" Play <br /> system instead of wading pool: $68,000 <br /> Deduct Alt..4. Field#4 Ltg.: ($43,550) <br /> Deduct Alt. 6 Bare Root Trees: ($46,141) <br /> Deduct Alt 11 Reconstruct Manhole: ($906) <br /> Grand Total: $1,871,202.40 <br /> 2. Reject all bids, revise contract documents, re-bid project at the same time as the new park <br /> buildings. Begin park construction September 4, 2001 with completion date of November 15, <br /> 2002. <br /> Based on proceeding with option I the overall,complete Central*Park Project cost is as follows: <br />. ® r P Plans <br /> BRW Engineering Fees for Central Park a , <br /> Specification and Construction Administration: $235,550 <br /> Central Park Redevelopment Construction Cost: $1,871,202 <br /> Central Park Pavilion/Warming House: $546,362 <br /> Permanent Rest Rooms for Water Tower Playground: $76,825 <br /> Silver Point Pavilion (DNR Funded) ($314,206) <br /> SHE.Architectural Fees: $93,739 <br /> Grand Total: $2,823,678. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.