My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
StAnthony
>
City Council
>
City Council Resolutions
>
1980
>
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:12:31 PM
Creation date
12/30/2015 7:12:29 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1980
SP Name
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,i <br /> t <br /> City of St. Anthony <br /> • July 7, 1980 <br /> Page 2 <br /> Roseville and any underground conveyance is to be located on Anthony Lane <br /> within the city of St. Anthony. <br /> The foregoing plan is to be presented in a bound report form with complete <br /> discussion, preliminary drawings, substantiating data, design basis and cal- <br /> culations together with cost estimates for the proposed facilities; including <br /> suggested proportion of cost sharing by each community. <br /> Our compensation for the above services shall be on the basis of 2.30 times <br /> payroll cost, mileage and out of pocket expenses. The hourly charge-out rate <br /> shall be based upon the attached schedule. <br /> 1 <br /> We estimate that the cost on the foregoing basis for services of this proposal <br /> to be Five Thousand Dollars ($5,000.00). <br /> It is understood that if the work to be performed is not completed upon reach- <br /> ing the cost estimated above, we will advise you as to the cost to complete the <br /> work. Under this proposal , St. Anthony and Roseville agree to make available <br /> to us and furnish us with all existing improvement information in the way of <br /> maps, records, plans, contours., profile studies, etc. which are available in <br /> respect to work undertaken herein. <br /> During the course of this study and investigation we are to attend any and all <br /> conferences deemed desirable and proper regarding this matter with officials <br /> of the city, state, and Rice Creek Watershed District, when authorized. <br /> It is to be specifically understood that engineering services in this proposal <br /> do not include the cost of laboratory analysis, the cost of boundary surveys <br /> or underground exploration of the subsurface conditions. These items will be <br /> furnished on request and at our actual cost therefor. <br /> •: It i.s to be understood that in signing this proposal we are authorized to proceed <br />
The URL can be used to link to this page
Your browser does not support the video tag.