My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
StAnthony
>
City Council
>
City Council Resolutions
>
1980
>
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:12:31 PM
Creation date
12/30/2015 7:12:29 PM
Metadata
Fields
SP Box #
23
SP Folder Name
RES 1980
SP Name
RES 80-046 RESOLUTION AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE JOINT POWERS AGREEMENT FOR STORM SEWER FEASIBILITY STUDY (ANTHONY LANE NORTH AREA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHORT-ELLIOTT-HENDRICKSON, INC. <br /> ® ® CONSULTING ENGINEERS <br /> ST. PAUL, MINNESOTA CHIPPEWA FALLS, WISCONSIN <br /> • i <br /> July 7; 1980 RE: ST. ANTHONY, MINNESOTA <br /> ANTHONY LANE STORM DRAINAGE <br /> BASED ON JOINT POWERS AGREEMENT <br /> WITH ROSEVILLE, MINNESOTA <br /> OUR FILE NO. 80100 <br /> City of St. Anthony , <br /> 3301 Silver Lake Road <br /> St. Anthony, Minnesota x <br /> Attention: Mr. Larry Hamer, <br /> Superintendent of Public Works <br /> j <br /> Pursuant to our recent conference with Mr. Larry Hamer, Superintendent of <br /> Public Works and Mr. Charles Horchell , Director of Public Works, Roseville; <br /> we are p'eased to submit herewith our proposal for engineering services for <br /> • investigation, study and report of surface drainage, located in both the <br /> cities of St. Anthony and Roseville. We are advised that this work is <br /> being performed for both St. Anthony and Roseville, authority being embraced <br /> in an inter-municipal joint powers agreement with St. Anthony functioning as <br /> the contracting agency therefor. <br /> The specific area of study i�, Anthony Lane within the City of St. Anthony <br /> and the drainage area within Di nage District 8 W (from Roseville 1962 Master <br /> Plan for Storm Sewers) discharging into St. Anthony. The area in Roseville <br /> lies- generally east of the city of St. Anthony, north of County Road "C" and <br /> west of. Williams Pipeline Company -storage farm. This- area is also southeasterly <br /> of Mn/DOT T.H. 88. <br /> STORM DRAINAGE - JOINT POWERS AGREEMENT <br /> The proposed engineering services consist of the investigation and study of <br /> surface drainage, storm water detention ponding and storage and underground <br /> conveyance tributary to an existing storm sewer located in County Road "C". <br /> • The proposed storm water detention pond is to be located within the city of <br /> 3 <br /> 200 HILLSBOROUGH OFFICE BLDG 2353 RICE STREET • S-. PAUL, MINNESOTA 55113 PHONE (612) 484-0272 <br />
The URL can be used to link to this page
Your browser does not support the video tag.