My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL MINUTES 10061986
StAnthony
>
Parks & Planning Commission
>
Planning Commission Minutes
>
1986
>
PL MINUTES 10061986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:54:56 PM
Creation date
12/30/2015 5:54:55 PM
Metadata
Fields
SP Box #
21
SP Folder Name
PL MINUTES AND AGENDAS 1986
SP Name
PL MINUTES 10061986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY- OF ST _ ANTHONY <br /> • SPECIAL PLANNING COMMISSION MEETING <br /> MINUTES <br /> OCTOBER 6 , 1986 <br /> The meeting -opened at 7:37 P.M. with Hansen, Wagner, Werenicz, and Jones present. <br /> Chair Franzese arrived at 7:40 P.M. <br /> Absent: Madden and Bowerman. <br /> Also present: City Manager Childs and John Arkell , President of Arkell Development <br /> Redevelopers of Phases II and III Kenzie Terrace Redevelopment <br /> Project. <br /> Meeting Objective . Commission input related <br /> to changing project use from senior rental to <br /> adult market rate housing _ <br /> Proposed Changes From Project Approved December, 1985 <br /> Structures: 3 identical buildings (probably phased) , rather than <br /> 3 buildings as previously approved. <br /> Height: 4 stories from -5 to 8 stories as previous approved. <br /> • Units: 288 instead of 300 <br /> Parking: 446 spaces instead of 380 -- indoor, 177 (59 per build- <br /> ing) from 228; surface, 269 from 152. <br /> Building Area Coverage: 63,900 sq. ft. (23% of total site area) . <br /> Community Space: reduced to central location in each building. <br /> Commercial : 33,000 sq. ft. proposed to be eliminated by architect but <br /> not yet finally approved by developer. <br /> Design: pitched roofto match 202 building. <br /> Exterior: brick on center building areas, rest prefinished wood <br /> or aluminum siding. <br /> Construction Start-up <br /> Date: May or June, 1987 if project proceeds on schedule. <br /> Redeveloper ' s Reasons For Change <br /> 1 . It would be "suicidal " to proceed with 300 more senior units when only 50 of <br /> 150 .Kenzington units sold in a year and a half. <br /> • 2. There is a burning need for more market rate rental in St. Anthony. <br /> 3. There are almost identical projects. in Bloomington and near Hopkins (Conservatory) <br /> renting two bedroom units for $700 to $900 per month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.