My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05211991
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1991
>
PL PACKET 05211991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:41:49 PM
Creation date
12/30/2015 3:41:44 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1990-1991
SP Name
PL PACKET 05211991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Copy #1 DRAFT <br /> 7. Rear Yard <br /> a. All lots abutting the lake shall be a rear yard measuring in depth of <br /> at least seventy-five feet from the high water elevation of the lake (the <br /> high water elevation shall be determined by the Department of <br /> Natural Resources). <br /> b. All lots zoned R-1 A not directly abutting the lake shall have a rear <br /> yard measuring in depth a distance equal to 20% of the depth of <br /> the entire lot but in no case less than twenty-five feet. <br /> 8. All structures, and detached accessory uses defined in this section must <br /> meet all setback requirement of this section and have the advance approval <br /> of the Rice Creek Watershed District. <br /> Subdivision 6. General Regulations <br /> Additional regulations are set forth in Section 12. <br />
The URL can be used to link to this page
Your browser does not support the video tag.