My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 01301996
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1996
>
PL PACKET 01301996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:31:18 PM
Creation date
12/30/2015 5:31:13 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1996
SP Name
PL PACKET 01301996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r' O 1 <br /> Duane C. Grace--Building Official <br /> City of Saint Anthony,Minnesota <br /> 4375 McMenemy Street <br /> Vadnals Heights,Minnesota 55127-6003 <br /> Phone -490-0142 'Building Official Fax. 490=7 9 <br /> 27 December 1995 <br /> Mr. Larry Kamer- City of Saint Anthony,MN <br /> Mr, Jack Amdal, AIA-Vice President,KKE Architects <br /> Re; Super Value store -•Apache Shopping Center,; <br /> Gentlemen; <br /> A few comment based upon our meeting of this afternoon,between we three regarding <br /> the above project. <br /> The present plans are to subdivide the property,creating one lot' for the new Super Value <br /> store and one lot for the present Mall.building, after removing a portion of the northerly <br /> end of the present building. Plans at this time are to remove eVerything from the most <br /> northerly end of the structure down to the South wall of the J.C. Penny store. Other lots <br /> would be created on this large site,but they do not affect these two structures for <br /> purposes of these comments. <br /> The Super Value store willbe construoted with 60 ft. of open area all around the structure <br /> and a fully automatic fire suppressions systeiri iri:order to qualify for the unlimited area <br /> options of the present Mjrinesota State.Building Code: Future plans are to expand the <br /> building by some over 12,000 sq. ft. and inn-a Southerly direction,thereby taking up this <br /> 60 ft. of open space. <br /> The present Mall building, ager the demolition to the northerly portion will be requesting <br /> a variance for a zero lot line configuration on the North line. The balance of the building <br /> will have the required 60 fti all around:with the'=fully automatic fire suppression system, <br /> No plans at this time have requested;aii opening between the two parcels of land. <br /> We stated that the renovation of the present Mall should include a TWO-hour(2)area <br /> separation wall to be constructed oii that portion of the northerly*all of the renovated <br /> Mall building, that is at right angles to the tatt west ekterior walls of the Super Value <br /> store. This wall need to include an extension of it miiumum of Five feet beybnd those <br /> points of termination of the southerly portions ofthe east west walls of the Super Value <br /> store, at the northerly wall of the Niall, This wall needs to conform td the requirements of <br /> UBC Section 504.6,. <br /> I have no problem with the request.for a.variance.to the zoning ordinance to create this <br /> zero lot line configuration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.