Laserfiche WebLink
P O 2 <br /> 27 December IM <br /> Mr. Larry Hamer- City of Saint.Anthony Page 2 of 2itges. <br /> Mr. Jack Amdahl -AIA --KK.B Architects. <br /> Re: Apache Plaza and propo ed renovation of the existing mall structure and additldh <br /> of a free standing Super Value Store,.` <br /> r. <br /> This will allow the Super Value store..to.be constructed as presently planned, and at a <br /> later date, to be connected to the mall structure via connection to that area separatioh <br /> wall,providing that the code requirements have not been modified or changed in the <br /> mean time. What ever code is in effect at the time of permit regtiest for that additional <br /> will be the rules to be followed at that date. <br /> Please note that the area separation wall requires a little 8pe'di61 design when used as a <br /> bearing wall, as well-as performing the.fiuictj.dn of a''area sdbaration" 'wall. They dre <br /> required to separate the builft iiito:soparate buildings: In some cases it may iequire <br /> building two (2) -2 hr.walls;to:satisfy:those requirements. <br /> Any questions please contact me, <br /> uanG C�ace _ <br /> Building Official. <br />