My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 12142015
StAnthony
>
City Council
>
City Council Work Session
>
2015
>
CC WORKSESSION 12142015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2016 11:51:25 AM
Creation date
1/27/2016 11:49:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo - SAV Connection_2015_0818 Page 2 of 3 <br /> <br />Two potential options for connection to the City of Minneapolis water system by Saint Anthony Village <br />were identified for evaluation: <br /> <br />1. Connection to Pipeline 16 at one of several possible locations between 40th Avenue Northeast and <br />Lowry Avenue Northeast. <br />2. Providing a connection to the outlet piping of the Hilltop reservoirs at Stinson Boulevard between <br />45th Avenue NE (County Road E) and 5th Street NW, and routing a new water main South on Stinson, <br />East on County E, and South on Silver Lake Road and connecting with the existing 12” Saint Anthony <br />Village water main. This new water main could possibly be combined with a main serving the City of <br />New Brighton. The length of the main required would be approximately 4,400 feet along this route. <br />Because of the length of the main and the significance of the roads along the route, this option was <br />not considered further. <br /> <br />Four potential locations for connection to Pipeline 16 were evaluated, with any number of other locations <br />potentially being viable for consideration. <br /> <br />Further Discussion of Option 1 <br /> <br />Pipeline 16 is a 48-inch welded steel water main constructed 1949-1950, which begins at the Hilltop <br />Reservoirs. There are a total of four interconnected reservoirs at Hilltop with a total capacity of 72 million <br />gallons. The pressure for Pipeline 16 under normal operation is controlled by the level in the Hilltop <br />Reservoirs and regulated by a control valve located downstream where the pipeline runs through the <br />Columbia Heights treatment campus. The City of Minneapolis has adequate pumping capacity with <br />sufficient redundancy to be able to continue to maintain sufficient levels in the Hilltop Reservoirs to <br />accommodate additional consumption as considered in this study. Pipeline 16 is part of the City of <br />Minneapolis outer transmission main loop and is routed south along Arthur Street, Benjamin Street, and <br />Stinson Boulevard to Lowry Avenue NE, and continues south. Pipeline 16 was field-lined in 1963 with <br />cement mortar. Elevations and pressures are as follows: <br /> <br /> Hilltop Reservoirs Water Surface Elevation <br />o Range: 1054 -1074 feet above Mean Sea Level (MSL) (overflow) <br /> <br /> Pipeline 16 Control Valve at Columbia Heights Campus <br />o Outlet Pressure HGL <br /> Approximate Range = 1045 – 1061 feet above MSL <br /> Normal Operation = 1050 feet above MSL <br /> <br />Table 1 lists several possible connection points to Pipeline 16 giving ground elevation at these points, as <br />well as the corresponding approximate hydraulic grade lines based on the normal control valve outlet <br />pressure of 1050 feet MSL. Head losses are not included, as the flow in Pipeline 16 is typ ically in the range <br />of 25-35 MGD and head losses for purposes of this analysis are relatively small. Also included are <br />approximate distances to potential points of connection to the Saint Anthony distribution system. It is <br />assumed given the size of the Pipeline 16 that further evaluation of residual pressures is unnecessary at this <br />time. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.