Laserfiche WebLink
Memo - SAV Connection_2015_0818 Page 3 of 3 <br /> <br /> <br />Table 1 – Summary of Possible connections to Saint Anthony Village Distribution System <br /> <br />Option Connection <br />Location <br />(Minneapolis) <br /> <br />Connection Location <br />(St. Anthony Village) <br />Ground <br />Elevation <br />(ft MSL) at <br />point of <br />connection <br />to MPLS <br />Approx. <br />Grade Line <br />(ft) at point <br />of connection <br />to MPLS1 <br />Correspond <br />ing <br />pressure <br />(psi) at <br />point of <br />connection <br />to MPLS <br />Approx. <br />Length of <br />New <br />Connecting <br />WM (ft) <br />1-A Pipeline 16 40th Avenue at Arthur <br />Place NE (8” Water <br />Main) <br />980 70 <br /> <br />30 1,100 <br />1-B Pipeline 16 Stinson Boulevard at <br />27th Avenue NE (8” <br />Water Main) <br />918 132 57 50 <br />1-C Pipeline 16 Stinson Boulevard at <br />26th Avenue NE (north <br />of intersection) (8” <br />Water Main) <br />924 126 55 50 <br />1-D Pipeline 16 Stinson Boulevard at <br />Lowry Av. NE (10” <br />Water Main) <br />932 118 51 450 <br />1 – Based upon “typical” control valve outlet pressure of 1050’ as provided by City of Minneapolis Water <br />Operations. Ranges of expected pressures may be predicted by varying control valve outlet pressure within <br />the ranges provided above. <br /> <br />Other Options not Evaluated <br /> <br />Connection to other water mains to the west of Saint Anthony Village was not considered because all of <br />these mains were within the Northeast High Service area. Northeast High Service Pump Station has a firm <br />capacity of 2,500 GPM, which is less than the stated maximum demand of 3,000 GPM for Saint Anthony <br />Village.