My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05071996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 05071996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:35 PM
Creation date
4/19/2016 5:54:24 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 05071996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> MEMORANDUM <br /> DATE: May 1, 1996 <br /> TO: Michael Mornson, City Manager <br /> FROM: Don Perry, Liquor Operations Manager <br /> ITEM: RELOCATION OF COOLER AT STORE 2 <br /> • <br /> The cost of moving the cooler from Store 2 to a new location will be $10,975 <br /> plus tax. This bid does not include electrical work, which is estimated at <br /> $1,000. <br /> There is a second bid for replacement of the glass door assembly. The existing <br /> glass doors have been in service for a long time and several are in need of <br /> repair. The replacement doors are very efficient and could save a great deal of <br /> energy versus the existing doors. The additional cost is $9,915, plus tax, <br /> bringing the total cost of the move to $20,890. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.