My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05071996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 05071996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:54:35 PM
Creation date
4/19/2016 5:54:24 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1997
SP Name
CC PACKET 05071996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> • April 8, 1996 <br /> Mike Morrison, City Manager <br /> City of St. Anthony, Public Works <br /> 3301 Silver Lake Rd. <br /> St. Anthony, MN 55418 <br /> RE: Proposed PCS Antenna Installation <br /> Dear Mr.Morrison: <br /> Please accept this letter as a proposal from APT(American Portable Telecom)to enter into a Lease <br /> Agreement for communication and antenna space at the referenced location. APT has retained the <br /> services of TEA Group Incorporated for the purposes of acquiring sites for the installation and <br /> operation of PCS(Personal Communication Services)radio equipment. <br /> APT, a subsidiary of Telephone and Data Systems, Inc. was awarded the PCS license by the FCC <br /> • for the Minneapolis/St. Paul area. I have enclosed a brochure which describes, in greater detail, <br /> APT and its operation. <br /> APT engineers have determined that the property appears to be suitable for the location of one of <br /> our communication sites. At this time, the typical APT equipment installation consists of a 150' <br /> self support tower, nine (9) directional panel antennas (77" high x 6" wide x 1.5" deep) which <br /> operate within the 1.9 ghz to 2.2 ghz radio frequency range. Additionally, up to four(4)equipment <br /> cabinets (each approximately 5' high x 3' wide x 3' deep), may need to be installed at the site <br /> (initially, the site will need one equipment cabinet). For access, the equipment cabinets will need <br /> to be placed in an area approximately 35' x 45' in size. Typically, these weather-proof, self- <br /> contained equipment cabinets are connected to the antennas by 1 5/8" cable(each antenna requires <br /> one cable run). The communication equipment requires 100 amp, 220 volt, single phase electrical <br /> service. <br /> With your input and approval, we will design and engineer a site specific layout for these <br /> locations. <br /> APT is prepared to make the following offer to you: <br /> TER: An initial lease term of five(5)years, including three(3)6-year extension periods. <br /> RENT: 6,000 annually,paid in advance. (negotiable) <br /> • ESCALATION'S: A 3% increase per year. <br /> OTHER: All cost associated with the communications site will be paid for by APT. <br /> 1040 Crown Pointe Parkway■ Suite 800 ■ Atlanta, Georgia 30338 ■ (770) 481-2100 ■ Fax (770) 481-2150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.