Laserfiche WebLink
- 4-5 <br /> Department of Public Works <br /> Paul L.Kirkwold,P.E.,Director and County Engineer <br /> ENGINEERING/OPERATIONS <br /> ADMINISTRATION/LAND SURVEY 3377 N. Rice Street <br /> 50 West Kellogg Blvd.,Suite 910 Shoreview, MN 55126 <br /> RAIvtSEY COUNTY St. Paul,MN 55102 • (612) 266-2600• Fax 266-2615 (612) 484-9104 • Fax 482-5232 <br /> May 22 , 1996 <br /> Mr. Jerry Pertzsch <br /> Boonestroo, Rosene, Anderlik & Associates, Inc . <br /> 2335 West Highway 36 <br /> Roseville, Mn. 55113 <br /> S . P. 62-644-16 , Proposed Bridge 62568 <br /> Replace Bridges 6631 & 62503 over the C. P . Rail System track on Silver <br /> lake Road just north of County Road D <br /> Your firm is requested to submit a proposal for design services for <br /> the replacement of the referenced bridge . Written and oral proposals <br /> are tentatively scheduled for the week of June 10 , 1996 . The exact <br /> date and hour for your proposal presentation will be furnished you on <br /> or about May 29, 1996 . Proposals will be presented to a review <br /> committee consisting of Tim Mayasich, Ramsey County Public Works <br /> Transportation Planner, Bob Paine, Ramsey County Public Works <br /> Construction Engineer and myself . Proposal presentations will be <br /> • limited to 45 minutes . The selected consultant will be notified within <br /> 5 days following the proposal presentations . <br /> PROJECT SCOPE <br /> The project will consist of the replacement of bridges 6631 & 62503 , <br /> reconstruction of Bridge approach grades as required to fit the new <br /> structure to the site and milling and overlaying the balance of the <br /> segment located between County Road D and Silver Lane . Replacement of <br /> deteriorated drainage structures and curb and gutter sections and <br /> minor modifications to existing signal systems will also be required. <br /> Funding for the project will consist of Federal Bridge Replacement <br /> funds, State Bridge Bond Funds, Ramsey County State Aid Funds and <br /> possible local funds from the City of St . Anthony. Federal funds have <br /> been allotted for this project for the year 2000 . The County will move <br /> to advance these funds to an earlier year. Design parameters shall be <br /> in accordance with State-Aid and Federal-Aid guidelines and the AASHTO <br /> Specifications for Highway Bridges . Track clearances shall meet the <br /> requirements of the Minnesota Public Utilities Commission and the C. P . <br /> Rail System. <br /> Initial roadway section shall consist of two traffic lanes in each <br /> direction with turn lanes provided at major intersections and <br /> entrances and concrete sidewalks on each side . Final roadway and <br /> sidewalk widths shall be as approved by the County and the City of St . <br /> Anthony following the public and agency involvement process . The new <br /> • , structure type shall be as recommended by the consultant based on best <br /> Minnesota's First Home Rule County <br /> printed on recycled paper with a minimum of 10%postconsumer content <br />