Laserfiche WebLink
Inspections 99% complete May 1, 1998 <br /> • Inspections of remaining I% (difficult access) Summer, 1998 <br /> Prepare computer data base February - April, 1998 <br /> Submit completed data base to City September, 1998 <br /> Fee <br /> With the understanding that the City of St. Anthony provides a listing of resident names,addresses, <br /> property identification numbers, and city address maps, WSB proposes to complete the identified <br /> program tasks for the following fees,assuming 3000 connections, 300(10%)of which will fail the <br /> first inspection and require a second inspection and 30 (1%) will refuse to cooperate with the <br /> inspection program and will require "extra" effort from both the City Staff and the site inspector. <br /> Task Description Proposed Cost <br /> 1. Project coordination and management: <br /> a. Meeting between WSB Staff and City Staff to define program, <br /> establish needs, and mitigate project. $400 <br /> b. Coordinate with City Staff throughout project. $800 <br /> 2. Design and preparation of Public Information documents <br /> (not including printing, postage and labels): <br /> a. Insert for water bills. <br /> b. Direct mail letters for Public Information Meetings. <br /> C. Sketch of proper sump pump connection. <br /> d. Inspection forms. <br /> e. Warning sticker. <br /> f. Door knob hangers. $1,200 <br /> 3. Hold three (3) Public Information meetings at site determined <br /> by the City Council. WSB project engineer and inspector to attend. $900 <br /> 4. Conduct initial inspections and prepare data base. <br /> a. First Inspection 2970 @ $30/each $89,100 <br /> b. Second Inspection 300 @ $45/each $13,500 <br /> 5. Prepare two (2) interim reports and one (1) final report <br /> and present to the City Council. $1,600 <br /> 6. Follow-up inspections of"difficult" estimated at Hourly at standard <br /> 1% of connections. billing rates. <br /> • 'Total $107,900 <br /> Pap 4 F:IWPW/NIPROPOSALI059.91propo I <br />