My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02031998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 02031998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:51:49 PM
Creation date
4/19/2016 5:51:42 PM
Metadata
Fields
SP Box #
37
SP Folder Name
CC PACKETS 1998
SP Name
CC PACKET 02031998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C� <br /> ' 4. Prepare a data base which includes all of the inspection data for future reference and follow- <br /> up inspections to maximize long term compliance. <br /> WSB proposes to provide an engineer and inspection group to complete the recommended program <br /> for the City. Chuck Janski would be designated as the project engineer. Chuck has over 15 years <br /> ' experience in I/I projects, and would assist in setting up the program, making presentations at the <br /> four public information meetings,training and supervision of the inspection personnel assigned other <br /> project.Chuck has conducted similar sump pump inspection programs in conjunction with the Cities <br /> of Plymouth, Champlin,Waseca,and Zumbrota in the past few years. The inspection group would <br /> be made up of WSB construction inspection personnel. An inspector would go door to door to enter <br /> each building and determine a pass/fail condition of the building. An additional person in the <br /> inspection group would be assigned to take telephone calls and set up appointments for residents that <br /> could not be contacted through the initial attempts. This person would also enter the inspection data <br /> ' into the computer data base which would be delivered to the City upon completion of the inspection <br /> work. <br /> ' Schedule <br /> We understand that the City Council is currently reviewing an ordinance to provide for the private <br /> ' property inspections and surcharge fees for non-compliance. Assuming the ordinance will be in <br /> effect during February, 1998, we would recommend initiation of the public information, and sump <br /> pump inspection program under the following preliminary schedule: <br /> Submittal of MCES Application February 10, 1998 <br /> MCES Loan Offer March 30, 1998 <br /> Meeting with the City Staff and development of program April 6, 1998 <br /> 1 Assist City Staff with Preparation of Newsletter Articles April, 1998 <br /> June, 1998 <br /> ' Assist City Staff with Preparation of Educational Video July -August, 1998 <br /> re: I/I Problem <br /> ' Prepare mailing packet- City wide and I` "target" area September, 1998 <br /> Distribute individual letters of invitation to first group of September, 1998 <br /> ' 575 households for public information meeting <br /> Public information meeting Area 1 October, 1998 <br /> Initiate inspections in Area 1 November, 1998 <br /> Prepare mailing for 2°d target area January, 1999 <br /> • Distribute individual letters of invitation to second group January, 1999 <br /> of 575 households for public information meeting <br /> ' Page 3 F.I{VM PROPOULI059 977lpmpr l <br />
The URL can be used to link to this page
Your browser does not support the video tag.