Laserfiche WebLink
3� <br /> 8/18/99 8:34 AM Cost Tabulation Sheet City enter actual quantities. <br /> . I Metro Transit Contract No. 98-015-72 <br /> FF� with the City of St.Anthon <br /> NO. DESCRIPTION QTY. UNIT TOTALS <br /> PRICE <br /> 1.0 RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br /> 1.1 Retrofit existing sign with new sign. I - x I I= $ - <br /> 1.2 Install new sign on existing structure. 1xj !=Is <br /> 1.2.1 Lengthen existing pipe or post. x = $. <br /> 1.3 Install holder. 1XI =€$ <br /> 1.4 Special 1.4: 1 1XI = $ <br /> X1.0 Sub-total =�$ <br /> 2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN &STOP ARE VACATED/RELOCATED. <br /> 2.1 Remove and patch, soil/blacktop. x =[s <br /> 2.2 Remove and patch, concrete. 1XI = $ <br /> 2.0 Sub-total = $ <br /> 3.0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN. <br /> 3.1 U-post(concrete). <br /> 1xj <br /> = $ <br /> 3.2 U-post(non-concrete). x = $ <br /> 3.3 Round pipe(concrete). 1XI = $ <br /> 3.4 Round pipe(non-concrete). 1XI 1=,$ <br /> 13.0 Sub-total 1=�$ <br /> 4.0 OTHER. I <br /> 4.1 Special 4.1: x = $ <br /> 4.2 Special 4.2: 1xi 1=4 <br /> 4.0 Sub-total = $ <br /> GRAND TOTAL=[$ <br /> I � <br /> � ; I <br /> I i <br /> Agreement(unit prices) PAYMENT OPTION NO. 1 <br /> Agreement(time& material) PAYMENT OPTION NO. 2 <br /> i <br /> Approx. %of work done by City's own resources. I % <br /> Approx. %of work done by City's sub-contracts. <br /> Approx. % of work done by City's agreement with Ci of <br /> Totals = %I I <br /> Record of revisions: by on ; by_on ; by on ; by on <br /> (City or WT.): of of of of <br /> Version <br /> v_1 Checked by Metro Transit Public Facilities Dept., by Date: <br /> Date received by Metro Transit: <br /> v I Quantities of work performed and approx.%of work entered by Date: <br /> Page 1 Interagency Agreement, Capital EXHIBIT D <br />