My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 79-025 A RESOLUTION APPROPRIATING FUNDS FOR WELL NO. 3 REPAIRS
StAnthony
>
City Council
>
City Council Resolutions
>
1979
>
CC RES 79-025 A RESOLUTION APPROPRIATING FUNDS FOR WELL NO. 3 REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:22:46 PM
Creation date
4/19/2016 5:22:45 PM
Metadata
Fields
SP Box #
36
SP Folder Name
CC RES 1979
SP Name
CC RES 79-025 A RESOLUTION APPROPRIATING FUNDS FOR WELL NO. 3 REPAIRS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> -2- <br /> We should paint all of the column pip to cut down on corrosion and try <br /> to get longer life out of our columns. In 1973 we replaced all of the column <br /> pipe and this time we have to replace 21 . The cost of sandblasting and painting <br /> the columns is $65 per ten foot section. We should at least paint the sections <br /> that are in the water, if we need an option. <br /> If we do what I recommend, we will have a cost of about $17,211 .05. <br /> 1 budgeted $10,000. 1 need a decision as soon as possible so we can get the <br /> well back in good working order. <br /> Larry Hamer, Director <br /> Public Works Department <br /> LH:pjr <br /> 4-17-79 <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.