My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
StAnthony
>
City Council
>
City Council Resolutions
>
1993
>
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 3:02:32 PM
Creation date
4/19/2016 3:02:31 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1993
SP Name
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i Engineering Services <br /> �I June 29, 1993 <br /> Page Two <br /> 2. Skycroft Drive, from 32nd Avenue NE Bituminous 660 <br /> 33rd Avenue NE <br /> 3. 31st Avenue NE, from Rankin Road to Bituminous 1,280 <br /> Silver Lake Road <br /> 4. Rankin Road, from 32nd Avenue NE to Bituminous 680 <br /> 33rd Avenue NE <br /> 5. 32nd Avenue NE, from Croft Drive Bituminous 660 <br /> Rankin Road <br /> Total Length (Overlay) 3,940 ft. <br /> The scope of work for these projects would be as follows: <br /> Reconstruction <br /> 1. Remove and replace curb and gutter. <br /> 2. Remove and replace surfacing with seven-ton per axle bituminous streets, thirty-two feet <br /> wide from back of curb to back or curb. <br /> 3. Remove and replace storm sewer as necessary. <br /> 4. Replace water main. <br /> 5. New driveway aprons - cut driveways to match new grade. Match existing width and <br /> material. <br /> 6. No sanitary sewer replacement. City to televise. Repair on own. <br /> 7. Restoration and resigning as necessary. <br /> 8. No sidewalk is proposed. <br /> Overlay <br /> 1. Crack sealing and patching by City. <br /> 2. Repair curb and gutter as necessary. <br /> 3. Mill edge of bituminous both sides to match concrete gutter. <br /> 4. 1/ 1/2" bituminous overlay on all streets listed, twenty-six feet wide from face of gutter to <br /> face of gutter. <br /> The scope of engineering services for these projects is proposed as follows (costs are identified <br /> based on a total construction cost of$550,000.00 for reconstruction and overlay improvements for <br /> the work described above): <br /> 490.2901.jun <br />
The URL can be used to link to this page
Your browser does not support the video tag.