My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
StAnthony
>
City Council
>
City Council Resolutions
>
1993
>
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 3:02:32 PM
Creation date
4/19/2016 3:02:31 PM
Metadata
Fields
SP Box #
26
SP Folder Name
RES 1993
SP Name
CC RES 93-043 RESOLUTION APPROVING MAIER STEWART & ASSOCIATES, INC. AS ENGINEERS FOR THE 1994 STREET CONSTRUCTION IMPROVEMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Engineering Services <br /> June 29, 1993 <br /> Page Three <br /> Estimated <br /> Task Cost <br /> 1. Feasibility Studies Prepared $ 6,930.00 <br /> (Projects to be assessed per State Statute 429) <br /> 2. Public Information Hearings 2,310.00 <br /> 3. Soil Testing Report 2,000.00 <br /> 4. Prepare Contract Documents (Plans & Specs) 27,720.00 <br /> 5. Receipt of Proposals 950.00 <br /> 6. Assessment Roll Preparation 3,500.00 <br /> 7. Contract Submittals 575.00 <br /> 8. Progress Meetings 1,560.00 <br /> • 9. Final Acceptance 575.00 <br /> 10. Record Drawings 950.00 <br /> 11. Construction Staking 16,500.00 <br /> 12. Full Time Resident Inspection $22,000.00 <br /> Not-To-Exceed Engineering Costs $85,570.00 <br /> It is assumed that no right-of-way or easement acquisition is needed for these improvements. If, <br /> during the course of the project, the scope of work changes the engineering costs would change <br /> and we would prvide a revised not-to-exceed cost in writing for city consideration. The schedule <br /> for the upcoming 1994 projects is broken down as follows: <br /> • <br /> 490-2901.jun <br />
The URL can be used to link to this page
Your browser does not support the video tag.