My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
StAnthony
>
City Council
>
City Council Resolutions
>
2000
>
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:14:20 PM
Creation date
4/19/2016 4:14:18 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 2000
SP Name
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
St. Anthony Maintenance Facility ®SEH <br /> St.Anthony,Minnesota Short Elliott Hendrickson Inc. <br /> • Project Construction Costs Final <br /> Revised Program A Page 1 of 2 May 10,2000 <br /> SEH No.A-SANTH9901.00 <br /> I.New Maintenance Facility <br /> 1.0 Vehicle Storage & Dept. Areas $1,447,840 <br /> 1.5 Street Dept.Vehicles/Equip. 18,098 @ $80.00 = $ 1,447,840 <br /> 1.7 Utility Dept.Vehicles/Equip. <br /> 1.9 Wash Bay <br /> 1.10 General Use Storage <br /> 2.0 Equipment Maintenance Operations $569,470 <br /> 2.1 Wood Shop 5,177 @ $110.00 = $ 569,470 <br /> 2.2 Metals &Welding Bay <br /> 2.3 Stationary Hoist Bay <br /> 2.4 Mobile Hoist Bay <br /> 2.5 Storage/Misc.Equip. <br /> 2.6 Parts Room/Mech.Office <br /> 2.7 Hazardous Material Storage <br /> • 4.0 Facility Support $298,780 <br /> 4.1 Administration/Reception 2,498 @ $110.00 = $ 274,780 <br /> 4.2 Lunch Room/Training Room <br /> 4.3 Mud Room <br /> 4.4 Toilets/Showers <br /> 4.5 Janitors <br /> 4.6 Mechanical/Electrical(Mezzanine) 1,275 @ $40.00 = $ 51,000 <br /> 4.7 Records/Resourcing Area <br /> Subtotal $2,343,090 <br /> 5.0 Site Issues- 10-20% $234,309-468,618 <br /> Subtotal $2,577,309 -2,811,708 <br /> 6.0 Construction Contingency- 10% $257,739-281,170 <br /> Total Probable Construction Costs $2,835,138-3,092,878 <br /> • Total Building Area 27,048 S.F. <br />
The URL can be used to link to this page
Your browser does not support the video tag.