Laserfiche WebLink
St. Anthony Maintenance Facility �S� <br /> St.Anthony,Minnesota Short Elliott Hendrickson Inc. <br /> • Project Construction Costs Final <br /> Revised Program A Page 2 of 2 May 10, 2000 <br /> SEH No.A-SANTH9901 <br /> II.Existing Structure-Warm& Cold Storage <br /> 1.0 Vehicle Storage Dept.Operations Areas $471,000 <br /> 1.1 Street Dept.Tool&Supply Storage 9,420 @ $50.00 = $ 471,000 <br /> 1.2 Parks Dept.Tool&Supply Storage <br /> 1.3 Utility Dept.Tool&Supply Storage <br /> 1.4 Sign Shop <br /> 1.5 Street Dept.Vehicles/Equipment <br /> 1.6 Parks Dept.Vehicles/Equipment <br /> 1.8 Cold Storage Vehicles/Equipment <br /> 1.11 Cold Storage Material <br /> 6.0 Construction Contingency- 10% $47,100 <br /> Total Probable Construction Cost $518,100 <br /> III.New Police & Fire <br /> • 3.0 Miscellaneous Operations $511,500 <br /> 3.1 Police 5,115 @ $100.00 = $ 511,500 <br /> 3.2 Fire Department <br /> 6.0 Construction Contingency- 10% $51,150 <br /> Total Probable Construction Cost $562,650 <br /> Probable Cost Summary <br /> I. New Maintenance Facility $2,835,138-3,092,878 <br /> II. Existing Structure-Warm&Cold Storage $518,100 <br /> III. New Police&Fire $562,650 <br /> Total Construction Cost - All Programmed Spaces $ 3,915,888 - $4,173,628 <br />