My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
StAnthony
>
City Council
>
City Council Resolutions
>
2000
>
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:14:20 PM
Creation date
4/19/2016 4:14:18 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 2000
SP Name
CC RES 00-041 A RESOLUTION APPROVING SHORT ELLIOTT HENDRICKSON TO PERFORM SERVICES RELATING TO A PHYSICAL NEEDS ASSESSMENT/ COST ESTIMATE FOR ALL CITY FACILITIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
St. Anthony Maintenance Facility �S� <br /> St.Anthony,Minnesota Short Elliott Hendrickson Inc. <br /> • Project Construction Costs Final <br /> Revised Program A Page 2 of 2 May 10, 2000 <br /> SEH No.A-SANTH9901 <br /> II.Existing Structure-Warm& Cold Storage <br /> 1.0 Vehicle Storage Dept.Operations Areas $471,000 <br /> 1.1 Street Dept.Tool&Supply Storage 9,420 @ $50.00 = $ 471,000 <br /> 1.2 Parks Dept.Tool&Supply Storage <br /> 1.3 Utility Dept.Tool&Supply Storage <br /> 1.4 Sign Shop <br /> 1.5 Street Dept.Vehicles/Equipment <br /> 1.6 Parks Dept.Vehicles/Equipment <br /> 1.8 Cold Storage Vehicles/Equipment <br /> 1.11 Cold Storage Material <br /> 6.0 Construction Contingency- 10% $47,100 <br /> Total Probable Construction Cost $518,100 <br /> III.New Police & Fire <br /> • 3.0 Miscellaneous Operations $511,500 <br /> 3.1 Police 5,115 @ $100.00 = $ 511,500 <br /> 3.2 Fire Department <br /> 6.0 Construction Contingency- 10% $51,150 <br /> Total Probable Construction Cost $562,650 <br /> Probable Cost Summary <br /> I. New Maintenance Facility $2,835,138-3,092,878 <br /> II. Existing Structure-Warm&Cold Storage $518,100 <br /> III. New Police&Fire $562,650 <br /> Total Construction Cost - All Programmed Spaces $ 3,915,888 - $4,173,628 <br />
The URL can be used to link to this page
Your browser does not support the video tag.