My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC RES 02-020 A RESOLUTION ORDERING PREPARATION OF REPORT ON IMPROVEMENT
StAnthony
>
City Council
>
City Council Resolutions
>
2002
>
CC RES 02-020 A RESOLUTION ORDERING PREPARATION OF REPORT ON IMPROVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 4:02:46 PM
Creation date
4/19/2016 4:02:45 PM
Metadata
Fields
SP Box #
31
SP Folder Name
RES 2002
SP Name
CC RES 02-020 A RESOLUTION ORDERING PREPARATION OF REPORT ON IMPROVEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� a <br /> ® Exhibit A <br /> Scope of Services to Prepare a Feasibility Report <br /> For <br /> Silver Lane Flood Problem Area <br /> Outlined below are the tasks associated with the completion of a feasibility report to address <br /> flooding in and around Silver Lane and the intersections of Fordham Road and Shamrock Road <br /> in the City of St. Anthony. <br /> Task 1 - Request Background Information <br /> As part of this task,the following information is anticipated to be collected: <br /> • Storm Water Management Plan from the City of New Brighton <br /> • Construction plans for the storm water conveyance system near the study area <br /> from the City of New Brighton <br /> • City of St. Anthony Storm Water Management Plan <br /> • St. Anthony storm sewer record drawings <br /> • Preliminary survey to record low building opening elevations and to verify <br /> existing elevations and pipe sizes of the existing storm sewer within the study <br /> area to be completed. <br /> • Task 2—Develop Hydrologic/Hydraulic Model <br /> As part of this effort, a hydrologic/hydraulic model with the trade name XP-SWMM, will be <br /> developed for the Study Area using the information contained in the City of New Brighton Storm <br /> Water Management Plan and the City of St. Anthony Storm Water Management Plan. This <br /> storm water model will be used to evaluate improvement alternatives. <br /> Task 3—Explore Alternatives,Develop Preliminary Cost Estimate <br /> Upon development of the hydrologic model, alternatives will be developed which will provide <br /> 100-year flood protection to the structures,tributary to the Silver Lane storm sewer system in the <br /> study area. It is anticipated that six alternatives will be developed. Preliminary cost estimates <br /> for each alternative will be prepared. <br /> Task 4—Prepare Final Report <br /> A final report outlining the procedures followed in developing the improvement options and the <br /> preliminary cost estimates will be prepared. Included in this task are two meetings, one with the <br /> City of New Brighton, and the second with Rice Creek Watershed District. <br /> The total cost to complete the feasibility study is estimated at $18,500. Attached is the proposed <br /> schedule,with completion of the project anticipated in February 2002. <br /> C.IDOCUME-IICKROEP-11LOCALS-IITEMPOR-11OLK161Resolution Prep Rpt Imp.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.