My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 03132001
StAnthony
>
City Council
>
City Council Minutes
>
2001
>
CC MINUTES 03132001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2016 5:35:01 PM
Creation date
4/19/2016 5:34:59 PM
Metadata
Fields
SP Box #
36
SP Folder Name
CC MINUTES AND AGENDAS 2001
SP Name
CC MINUTES 03132001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Study Session Minutes <br /> March 13, 2001 <br /> Page 5 <br /> 1 Mr. Stenglein thanked the Mayor for the introduction and reviewed several items that are new <br /> 2 with Hennepin County. He noted transportation, public safety and general services are major <br /> 3 concerns for the County this year. <br /> 4 Mr. Stenglein indicated the County is working heavily to increase transportation within the <br /> 5 Hennepin County area. He noted there would be a Lowry Avenue upgrade and was being <br /> 6 studied by the County to rebuild this area. Mr. Stenglein indicated light rail transit did get <br /> 7 approval and was now in the hands of MnDOT. He explained the light rail will be above ground, <br /> 8 with current plans heading from Minneapolis to the Mall of America and Minneapolis to St. <br /> 9 Cloud. <br /> 10 Mr. Stenglein noted for public safety the new correctional facility will be opened in August of <br /> 11 this year. He indicated the jail would be a holding facility and could house roughly 500 <br /> 12 individuals before their trials. Mr. Stenglein indicated this will be a great addition for the County <br /> 13 as the old holding cells were two floors within City Hall. He indicated Crim-Net would be <br /> 14 online within the next three years for the County as well. <br /> 15 Mr. Stenglein reported under general services, the St. Anthony Library renovations would begin <br /> 16 sometime this year with an opening set by the end of this year. He noted the County is very <br /> 0 excited for the growth in this area. <br /> 18 Councilmember Horst asked if the facing on the library has been discussed. Mr. Stenglein noted <br /> 19 he had hoped it would conform with the neighborhood and stated he was not aware of the style of <br /> 20 this structure to date. He noted there has been talks that all libraries would be structured <br /> 21 similarly to make them identifiable as Hennepin County buildings. <br /> 22 Mayor Cavanaugh indicated the library could become a catalyst to additional renovations near <br /> 23 the shopping center. <br /> 24 Councilmember Thuesen questioned how St. Anthony would fit into the light rail transit. Mr. <br /> 25 Stenglein noted the location of St. Anthony within the metro area was ideal. He indicated the <br /> 26 benefits from being located on the light rail transit schedule would eliminate the need to drive to <br /> 27 the airport or Mall of America in the future. <br /> 28 Mayor Cavanaugh asked when the County could foresee Silver Lake Road being resurfaced. He <br /> 29 indicated he would like to see some long range planning done on this roadway to alleviate future <br /> 30 concerns. Mayor Cavanaugh indicated the City would like to eliminate the blacktop sidewalk <br /> 31 once this is updated, as well. Mr. Stenglein indicated this could be brought up and reported back <br /> 32 to the City. <br /> Mayor Cavanaugh commended Mr. Stenglein for his efforts on the Hennepin County Library <br /> 46 system. He noted he felt the County was making great strides in this area to get ahead of other <br /> 35 county library systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.